Sec. 18-442. - Table No. 4; nailing schedule.
The following table no. 4 indicates the nailing schedule: Building Element | Nail Type | Number and Distribution Stud to plate | Common-toe nail | 4—8d Stud to plate | Common-direct | 2—16d Double studs | Common-direct | 16d 30″ on center Corner studs | Common-direct | 16d 30″ on center Sole plate to joist or blocking | Common | 16d 16″ on center Double cap plate | Common-direct | 16d 24″ on center Cap plate laps | Common-direct | 2—16d Ribbon strip — 6″ or less | Common-direct | 2—10d each bearing Ribbon strip — over 6″ | Common-direct | 3—10d each bearing Roof rafter to plate | Common-toe nail | 3—16d Roof rafter to ridge | Common-direct | 2—16d each rafter Jack rafter to hip/valley | Common-toe nail | 3—10d Floor joists to studs | Common-direct | 5—10d or 3—16d Ceiling joists to studs | Common-direct | 4—10d or 2—16d Floor joints to sill or girder | Common-toe nail | 2—16d Ledger strip | Common-direct | 2—16d at each joist Ceiling joists to plate | Common-toe nail | 2—16d Ceiling joists to rafters | Common-direct | 3—16d Ceiling joists (laps over partition) | Common-direct | 3—16d Collar beam — 1″ thick | Common-direct | 4—10d Collar beam — 2″ thick | Common-direct | 2—16d Bridging to joists | Common-direct | 2—8d each end Diagonal brace (to stud and plate) | Common-direct | 2—8d each bearing Tail beams to headers | Common-end nail | 3—16d Header beams to trimmers | Common-end nail | 3—16d each header 1″ sub-flooring 6″ or less | Common-direct | 2—8d each joist 1″ sub-flooring 8″ or more | Common-direct | 3—8d each joist 2″ sub-flooring | Common-direct | 2—16d each joist 1″ sheathing — 6″ or less | Common-direct | 2—8d each stud or rafter 1″ sheathing — over 6″ | Common-direct | 3—8d each stud or rafter Plywood sheathing | Common-direct | 8d 5″ on center exterior edges Plank roof decking and subfloor | Common-direct | 4″ or 6″ wide 2—10d 8″ wide 3—10d Roof sheathing — 6″ or less | Common-direct | 2—8d each rafter Roof sheathing — over 6″ | Common-direct | 3—8d each rafter Fiber board sheathing | Large head | 7—No. 11g×1¾″ per bearing under shingles 6″ on center Polystyrene | Large head | Same as fiber board Gypsum sheathing | Large head | Same as fiber board Shingles — wood 8″ or less | Corrosion-resistive | 2-length to penetrate sheathing over 8″ | Corrosion-resistive | 3-length to penetrate sheathing Weather boarding | Corrosion-resistive | 2—8d each bearing Shingles — asphalt | Corrosion-resistive roofing nail | 6 per shingle-length to penetrate sheathing Plywood subfloor | Common-direct | 8d panel edges 6″ on center intermediate 10″ on center Gypsum lath | Common-direct | 3d blue lathing nail For ⅜″ - 13 gauge 1⅛″, 19/64 ″ diameter head-flat | 16″ width require 4 nails per lath each support For ½″ - 13 gauge 1¼″, 19/16 ″ diameter head-flat | 24″ width require 5 nails per lath each support Shingle nails shall penetrate not less than ¾″ into nailing strips, sheathing or supporting construction except as otherwise provided in section 18-309.
(Ord. 29-73, 10-17-73)
Ask a question about Racine law
Corpus searches the Racine sections it holds and shows the ones that match, with their citations. Free, no sign-in.