For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 18-530 — Junction and fittings

Municipal Code of the City of Racine, Wisconsin (Codified through Ordinance No. 0082-26, adopted March 3, 2026. (Supp. No. 108)) · Racine Municipal Code § 18-530

Corpus is an independent public-information project, not the official City of Racine website. Stable reference: corpuslaw.us/code/215e9e6e-28db-4d83-a33e-855383e9db45

Sec. 18-530. - Junction and fittings.

The commissioner of public works and/or the general manager of the Racine Wastewater Utility shall inform plumbers of the position of junctions of the main sewer so far as such knowledge may be in his possession, but the commissioner and/or the general manager of the Racine Wastewater Utility shall not be responsible or liable to any parties for the exact precision of such information or lack thereof. When a building connection on the street or main sewer is not found within three feet of the point designated by the commissioner of public works and/or the general manager of the Racine Wastewater Utility, permission shall be given by the chief plumbing inspector upon request to make a new connection. In making any such new connection, a Y or T fitting approved by the chief plumbing inspector shall be used and such connection shall be made only in the presence of the chief plumbing inspector and in the manner directed by him. The connection shall be set upon or in a carefully cut opening centered in the upper quadrant of the street sewer, and shall be secured by encasement of the main sewer pipe and the fitting with concrete at least three inches thick so as to assure permanency of connection and adequate backing of the street sewer pipe. In lieu of the use of fittings and if the opening cannot be centered in the upper quadrant of the street sewer, a length of the street sewer pipe shall be removed and a Y branch section inserted in its place. The joints at the ends of such section shall be encased in concrete at least three inches thick.

(Ord. No. 07-16, 12-20-16)

Ask a question about Racine law

Corpus searches the Racine sections it holds and shows the ones that match, with their citations. Free, no sign-in.