§ 18-666 — Inspection of work under permits; certificate of approval or notice of defects
Municipal Code of the City of Racine, Wisconsin (Codified through Ordinance No. 0082-26, adopted March 3, 2026. (Supp. No. 108)) · Racine Municipal Code § 18-666
Corpus is an independent public-information project, not the official City of Racine website. Stable reference: corpuslaw.us/code/6c718557-76bb-4b56-9ed3-344ddb73f33e
Sec. 18-666. - Inspection of work under permits; certificate of approval or notice of defects.
At regular intervals, the chief electrical inspector shall visit all premises where work may be done under permits and shall inspect all electrical equipment installed under such permits since the date of his or her last previous inspection, and shall issue a certificate of approval for such work as is found to be in conformity with the provisions of this article, after the fees required by this article have been paid. If, upon inspection, the installation is not found to be in full conformity with the provisions of this article, the chief electrical inspector shall at once give to the person making the installation a written notice stating the defects which have been found to exist. Failure to make such repairs within the time specified shall constitute a violation of this article.
(Ord. No. 06-16, 12-20-16; Ord. No. 0003-24, pt. 15, 6-4-24)
Ask a question about Racine law
Corpus searches the Racine sections it holds and shows the ones that match, with their citations. Free, no sign-in.
