For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 86-52 — Procedure for approval

Municipal Code of the City of Racine, Wisconsin (Codified through Ordinance No. 0082-26, adopted March 3, 2026. (Supp. No. 108)) · Racine Municipal Code § 86-52

Corpus is an independent public-information project, not the official City of Racine website. Stable reference: corpuslaw.us/code/fa6683b1-56c0-4687-8c07-7b5f3260503b

Sec. 86-52. - Procedure for approval.

(a) Before submitting a final plat for approval, the subdivider shall cause to be prepared a preliminary plat and supplementary material and shall file with the secretary of the planning, heritage, and design commission a written application for approval of such plat, accompanied by ten blueprints, or other acceptable reproductions thereof, at least 21 days prior to the meeting of the planning, heritage, and design commission at which action is desired. The preliminary plat shall cover the entire area owned or controlled by the subdivider even though only a small portion thereof is proposed for development at the time. The planning, heritage, and design commission may waive this requirement where it is unnecessary to fulfill the purpose of this chapter and undue hardship would result from strict application thereof. (b) The preliminary plat shall be reviewed by the planning department for conformity with all ordinances, administrative rules and regulations and plans which affect subdivisions; and the planning department shall transmit a copy of the preliminary plat to the city engineering department and the traffic engineering department, the health department, the commissioner of public works, the wastewater utility and the water department for review and report concerning matters within their jurisdiction. Their recommendations in respect thereto shall be transmitted to the planning, heritage, and design commission not later than 14 days from the date the plat is filed. (c) The planning, heritage, and design commission shall, within 60 days of the filing of the plat, approve, approve conditionally, or reject the plat. One copy of the plat shall be returned to the subdivider with the date and action endorsed thereon and, if approved conditionally or rejected, the conditions or reasons for rejection endorsed thereon or attached thereto. (d) Approval or conditional approval of a preliminary plat shall not constitute approval of the final plat. Rather, it shall be deemed an expression of approval or conditional approval of the layout submitted as a guide to the preparation of the final plat, which will be subject to further consideration by the planning, heritage, and design commission. (e) Whenever it is proposed to replat a recorded subdivision or subdivisions, or any part of a recorded subdivision or subdivisions, the planning, heritage, and design commission shall hold a public hearing on the proposed preliminary plat of the replat before taking final action; provided however, where such replatting establishes larger lots than required by the zoning regulations, such replatting need not be submitted for approval.

(Code 1973, § 17.04.020; Ord. No. 13-97, pt. 1, 8-4-97; Ord. No. 0026-19, pt. 19, 11-12-19)

Ask a question about Racine law

Corpus searches the Racine sections it holds and shows the ones that match, with their citations. Free, no sign-in.