For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 86-92 — Required improvements

Municipal Code of the City of Racine, Wisconsin (Codified through Ordinance No. 0082-26, adopted March 3, 2026. (Supp. No. 108)) · Racine Municipal Code § 86-92

Corpus is an independent public-information project, not the official City of Racine website. Stable reference: corpuslaw.us/code/eff76997-6fd8-4f44-86e9-fbbdbf1d5057

Sec. 86-92. - Required improvements.

(a) Generally. After final approval of any residential, B-1 neighborhood convenience district, B-2 community shopping district and B-3 general commercial district plats located within the city and before any building permits are issued, the subdivider shall install street and utility improvements as provided in this section. The subdivider shall before recording of his plat enter into a contract with the city agreeing to install the required improvements and shall file with such contract a bond meeting the approval of the city attorney, or a certified check in an amount equal to the estimate of cost prepared by the city engineer, as a guarantee that such improvements will be completed by the subdivider or his subcontractors not later than one year from the date of recording of the plat, or one construction season. If the subdivider desires to avail himself of special assessment financing, he shall submit a petition to the city clerk in accordance with the applicable special assessment improvements policy of the city, requesting installation of such improvements and expressly waiving all legal requirements, including right to notice and hearing, with respect to the special assessments to be levied in connection therewith. The contractor and/or subcontractors who are to be engaged in the construction of utilities or street improvements on dedicated street rights-of-way shall be listed as qualified for such work by the department of public works. Governmental units to which these bond and contract provisions apply may file, in lieu of such contract or bond, a letter from officers authorized to act in its behalf, agreeing to comply with the provisions of this article. (b) Water. The subdivider shall either install adequate water facilities, including laterals to the street lines, subject to the specifications and inspections of the water department, or shall have filed after approval of the final plat, and prior to recording, a petition with the city clerk for installation of water mains in the plat. If performed by the city, the cost of engineering and supervision shall be charged to the developer at the rate of five percent of that portion of the final cost of the improvement, plus the cost of construction inspection. (c) Sewer. The subdivider shall either install adequate sewer facilities, including laterals to the street lines, subject to the specifications and inspections of the city engineering department and/or the wastewater utility, or shall have filed, after approval of the final plat, a petition with the city clerk and prior to recording for installation of sewers in the plat. If performed by the city, the cost of engineering and supervision shall be charged to the developer at the rate of five percent of that portion of the final cost of the improvements to be paid by the subdivider, plus cost of construction inspection. If public sewer facilities are not available, lot sizes shall be such that effective private disposal systems can be provided on the individual premises, and shall be determined on the basis of recommendations of the boards of health of the city and the state. (d) Street grading. The subdivider shall furnish drawings which indicate the existing and proposed grades of streets shown upon the plat and, after approval of street grades by the city engineer and the common council, shall grade or cause to be graded the full width of right-of-way of the dedicated streets. The bed for the roadways in the street rights-of-way shall be graded to subgrade, which is six inches below established grade. The city engineer shall approve the work prior to the time any building permit is issued. (e) Street surfacing. After sewer and water utilities have been installed either by the developer at his option or by the city, with the cost to be special assessed to benefited properties, when requested by the city the subdivider shall surface roadways to a width of 36 feet. The surfacing shall consist of not less than six inches of crushed limestone, conforming to department of public works specifications. (f) Sidewalks in public way. Dedicated walkways through blocks shall be improved by the subdivider with a city standard sidewalk to a grade established by the city engineer. Such work shall be inspected by the city engineer. Engineering and inspection costs shall be paid by the subdivider at the rate of five percent of the final cost of improvements. (g) Filing of final plat. After the subdivider has entered into a contract, guaranteed by a performance bond or a suitable contract acceptable by the city, by which he agrees to provide utilities and street improvements required in this article, such subdivider shall file with the city clerk the final plat as required under section 86-66.

(Code 1973, § 17.06.020)

Ask a question about Racine law

Corpus searches the Racine sections it holds and shows the ones that match, with their citations. Free, no sign-in.