Sec. 98-531. - Unplanned no-cost replacements.
Where only the customer-side lead service line or both the customer-side lead service line and the utility-side lead service line require(s) an unplanned replacement (e.g. emergency and/or failed or leaking service lines), the replacement(s) shall conform to this section at no cost to the property owner. (a) Inspection. The utility shall inspect all affected customer-side service lines for the presence of lead or galvanized material that is or was downstream of lead. (b) Notifications. If the customer-side service line is found to be constructed of lead or galvanized material that is or was downstream of lead, the property owner will be notified of such in writing, along with notification that the property owner must replace the customer-side lead service line. (c) Contractors and quotes. The utility shall provide the homeowner with a list of prequalified plumbing contactors. The property owner shall obtain from a prequalified plumbing contractor at least one quote to replace the customer-side lead service line. The utility at its discretion may request that the property owner obtain from a different prequalified plumbing contractor a second or subsequent quote. (d) Simultaneous replacement. The customer-side lead service line and the utility-side lead service line must be replaced at the same time, if applicable, unless an extension is allowed under subsection (f). (e) Replacement work. Within 30 days of the receipt of the replacement notice, or sooner if necessary, as determined by the utility, the property owner's plumbing contractor shall replace the customer-side lead service line. If applicable, the property owner's plumbing contractor shall coordinate with the utility such that the customer-side and utility-side lead service lines are replaced simultaneously. (f) Extension. If the property owner demonstrates a compelling need, the utility may, at its discretion, extend the time requirement for replacement of the customer-side lead service line, unless the utility determines that doing so would create an imminent threat to the health, safety, or welfare of the public. (g) Completion and payment. Upon completion of the customer-side lead service line replacement, the property owner's plumbing contractor shall provide the utility with a copy of the invoice for the work. Upon proof of completion satisfactory to the utility, the utility and/or the city shall pay directly to the property owner's plumbing contractor the actual cost of the replacement work.
(Ord. No. 0007-23, pt. 2, 11-14-23)
Ask a question about Racine law
Corpus searches the Racine sections it holds and shows the ones that match, with their citations. Free, no sign-in.