§ 102-202 — Application
Code of the City of Charleston, West Virginia (Supp. No. 56: codified through Bill No. 8069, enacted March 16, 2026) · Charleston, W. Va., City Code § 102-202
Corpus is an independent public-information project, not the official City of Charleston website. Stable reference: corpuslaw.us/code/b216f5bc-d349-4ec8-8621-8d5793eb4799
Sec. 102-202. - Application.
(a) A wireless provider seeking to conduct any excavation beyond the installation of a new pole within the public rights-of-way, shall follow the City of Charleston Public Rights-of-Way Excavation and Restoration Ordinance Manual, codified at section 102-91 of this Code with respect to its excavation activities. (b) A wireless provider's use of the public rights-of-way that does not require excavation shall follow the provisions of this article to file a permit with the city engineer, including that the permit application shall include the following: (1) The applicant's name, address, phone number, and email address, as well as all duly authorized representatives acting on behalf of the applicant (2) A general description of the proposed small wireless facility and associated pole, if applicable. (3) Construction and engineering drawings and information demonstrating compliance with state law and this article, including a structural analysis of the pole where the applicant proposes to install the small wireless facility; (4) An attestation that the small wireless facilities will be operational for use by a wireless provider within one year after the permit issuance date, unless the city and the applicant agree to extend the period or delay is caused by lack of commercial power or communications transport facilities to the site; (5) An attestation that the small wireless facility will comply with Federal Communications Commission regulations concerning (A) radiofrequency emissions from radio transmitters; and (B) unacceptable interference with the public safety spectrum and CII spectrum, including compliance with the abatement and resolution procedures for interference with the public safety spectrum and CII spectrum established by the Federal Communications Commission set forth in 47 C.F.R. 22.970 through 47 C.F.R. 22.973 and 47 C.F.R. 90.672 through 47 C.F.R. 90.675; (6) Proof that the applicant maintains property insurance for its property's replacement cost against all risks, workers' compensation insurance as required by law, and commercial general liability insurance with respect to its activities on city improvements or rights-of-way of not less than $1,000,000.00 of coverage for damages including bodily injury and property damage; provided that the commercial general liability policy shall include the city as an additional insured and the certification shall be filed with the application in order for it to be considered complete; provided, however, that a self-insured applicant shall provide sufficient evidence to demonstrate its financial ability to self-insure the insurance coverage; (7) An attestation that it will provide a bond, escrow deposit, letter of credit, or other financial surety required by the city to ensure removal of abandoned or unused wireless facilities or damage to the right-of-way or city property caused by the applicant or its agents, as set by the city, prior to beginning any installation; and (8) An attestation that it will notify the City of Charleston and call the West Virginia 811 "call before you dig" hotline in order to locate all underground utilities at least 72 hours before making any excavation. (c) A wireless provider that seeks to use a city utility pole shall provide the following additional information: (1) The additional wind load that the wireless facility adds to the pole; (2) A description of how the wireless provider will provide power to the wireless facility; (3) A description of how the wireless facility would attach to the pole, including whether it would involve drilling holes in the pole or attaching bands to the pole; (4) Whether there will be additional wire in the pole; (5) An attestation that the applicant is responsible for any damage that is caused by the negligence of the wireless provider or any of its officers, agents, employees, directors, or representatives related to installing, repairing, or maintaining facilities in rights-of-way; (6) An attestation that the wireless facility will meet all clearance requirements if it is over the roadway; and (7) An attestation that the wireless facility will not interfere with any other equipment signals on the poles that are owned by the city.
(Bill No. 7816, 5-6-2019)
Ask a question about Charleston law
Corpus searches the Charleston sections it holds and shows the ones that match, with their citations. Free, no sign-in.
