§ 102-311 — Definitions
Code of the City of Charleston, West Virginia (Supp. No. 56: codified through Bill No. 8069, enacted March 16, 2026) · Charleston, W. Va., City Code § 102-311
Corpus is an independent public-information project, not the official City of Charleston website. Stable reference: corpuslaw.us/code/2214a754-b596-4224-8730-9ceaedb1926a
Sec. 102-311. - Definitions.
The following words, terms and phrases when used in this Division shall have the meanings ascribed to them in this Section except where the context clearly indicates a different meaning: (a) Clearing means any activity that removes or causes the removal of the vegetative surface cover. (b) Construction means the act of building, grading, shaping, removing, demolishing, repairing, erecting, extending, installing equipment on/in, or enlarging any building, structure, grounds, or premises. (c) Construction site means a parcel of land or a contiguous combination thereof where land disturbing activity occurs. (d) Drainage way means any channel that conveys surface runoff throughout the construction site. (e) Erosion means the wearing away of land surface by natural or artificial forces such as wind, water, ice, gravity or vehicle traffic. (f) Erosion control means a measure that is designed to prevent erosion. (g) Erosion and sediment control plan ("ESCP") means a set of plans indicating the specific measures and sequencing to be used to control erosion and sediment on a construction site. (h) Grading means the cutting and/or filling of the land surface to a desired slope, elevation, or contour. (i) Impervious area means an area composed of any material which impedes or prevents the natural infiltration of water into the soil, including but not limited to, concrete, asphalt, and roof surfaces. (j) Land disturbing activity ("LDA") means any activity that results in the movement or manipulation of soil, rock or other earth materials. This includes, but is not limited to, clearing and grubbing, grading, excavation, filling, embankment construction, road grading, ditch cleaning, mineral extraction, commercial timbering, initial landscape preparation and stockpiling of earth materials. The activities set forth in section 102-314(b) of this division are exempt from the definition of land disturbing activity for purposes of this division. (k) Perimeter control means a barrier that prevents sediment from leaving a site by filtering sediment-laden runoff or diverting it to a sediment trap or basin. (l) Person means any individual, association, organization, partnership, firm, corporation or other entity recognized by law and acting as either the owner or as the owner's agent. (m) Phasing means disturbing a parcel of land in distinct phases, with the stabilization of each phase completed before disturbance of the next phase. (n) Sediment means soil, sand, silt, and minerals washed from land into water. (o) Sediment control means measures that prevent eroded sediment from leaving a construction site. (p) Stabilization means the use of practices that prevent exposed soil from eroding. (q) Start of construction means the first land disturbing activity associated with a construction project. (r) Stormwater compliance officer (hereinafter referred to as "compliance officer") means an employee of the City of Charleston City Engineer's Office or City Building Department designated by the city to administer, implement and enforce this article. (s) Watercourse means a body of water flowing in a reasonably defined channel with a bed and banks. (t) Waterway means a channel that directs surface runoff to a watercourse or to the MS4.
(Bill. No. 7656, 6-1-2015)
Ask a question about Charleston law
Corpus searches the Charleston sections it holds and shows the ones that match, with their citations. Free, no sign-in.
