For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 1385.04 — FINAL PLAN

Codified Ordinances of the City of Huntington, West Virginia (Codified through Ordinance No. 2025-O-31, adopted September 22, 2025. (Supp. No. 8)) · Huntington Codified Ordinances § 1385.04

Corpus is an independent public-information project, not the official City of Huntington website. Stable reference: corpuslaw.us/code/af62c484-7f25-48b9-b61e-4be02d0a068a

1385.04 - FINAL PLAN.

(a) General information. The final plan of a development shall conform substantially to the preliminary plan and shall be prepared in the following manner: (1) Materials. The final plan of a development shall be drawn to a scale of 100 feet or less to the inch. (2) Size. The final plan shall be drawn according to established methods used by the county clerk's office. (3) North point. The final plan shall be so oriented that the north point will be directed as nearly as possible to the top of the page with the binding edge on the left. (4) Page numbering. When more than one sheet is used for any final plan, each sheet shall be numbered consecutively and shall contain a notation indicating the total number of sheets in the plan. In addition, an index sheet of the same dimension shall be required showing the entire development, the sheet numbers, and outlines for each separate sheet of the final plan. (5) Number of copies. At the time of final application, the original and two copies of the final plan shall be submitted to the planning commission. (6) Copy to be recorded. Two copies of the final plan with all appropriate certificates shall be recorded with the county clerk. (b) Mapping and engineering information. The final plan of the development shall include sufficient data to accurately reproduce the development on the ground and shall include the following information: (1) Street lines on adjacent land. Show the exact location with dashed lines and the width along the property lines for all existing or recorded streets intersecting or paralleling the boundaries of the tract. (2) Monument references on adjacent land. Show the bearing and distances to nearest established street boundaries, established survey lines, or other official monument. (3) Adjacent land. For adjacent land which is planted, show the boundaries with dashed lines and the recorded name of the development. For adjacent land which is unplanted, show the boundaries with dashed lines. (4) Boundary lines of tracts. In a line style and weight which will distinguish the developer's property from all adjacent property (possibly a heavy, solid line) show the tract boundary lines with lengths of courses to hundredths of a foot and bearings to the nearest minutes. These boundaries shall be determined by an accurate survey in the field. (5) Monuments on tracts. Show the accurate location and material of all permanent reference monuments. (6) Street, easement, and lot lines on tracts. For street and alley rights-of-way, show the names, bearings, angles of intersection, and width including the widths along the line of any obliquely intersecting street; for all arcs, show the length of radii, points of curvature, and tangent bearings; for all easements or other rights-of-way, show the locations, width, and actual name and purpose (gas line easement, etc.); for all lot lines, show dimensions in feet and hundredths, and bearings and angles to minutes. (7) Easements along property lines. The minimum easement along boundary lot lines as required in section 77-10 of these regulations shall be noted on the final plan. (8) Reservations and dedications of tracts. Show the accurate outline of all property which is either offered for dedication to public use or which is reserved by covenant in the deeds for the common use of the property owners in the development with the purpose also plainly printed thereon. (9) Lot numbers, setback lines, and restrictions of the tract. Show the lots numbered in numerical order and lettered in alphabetical order; show the front yard setback building lines with dimensions; and if any private restrictions exist, show boundaries of each type of use restriction and any other restrictions. (c) Title block. The title block for the final plat drawing shall contain the following information: (1) Development Name. The name of the development and, where the plat at hand is only part of a larger development bearing the same name, the unit number or other necessary identification shall be indicated. Such development name shall not duplicate or closely approximate any other development name in the city. The name of the development shall be preceded by the words "Final Plat of _______." (2) Person identification. The name of the following: the property owner, the developer, the engineer and/or surveyor. (3) Legend information. The graphic scale, written scale, north point, date of preparation, and any other pertinent legend information should be indicated. (d) Certifications. The following appropriate certificates with required signatures shall accompany all final plats. (1) Ownership. The certification of ownership and general dedication shall be as follows: Certificate of Ownership and General Dedication (I, We)the undersigned (owner, owners) of the property shown hereon, hereby adopt this as (my, our) plan of development and dedicate the roads, rights-of-way, easements, parks, and other open spaces as shown and otherwise indicated to the public use forever, and hereby certify that (I am the owner, we are the owners) in fee simple of the property and that any portion of said property dedicated to public use is not encumbered by any mortgages. (I, We) further certify that all restrictive covenants which apply to the lots, if any, are either shown on the plan or are referred to thereon, with copies of the said covenants filed with the Planning Commission of Huntington, West Virginia, and the County Clerk. Date _____ _____ (2) Survey. The certification of survey shall be one of the following: Certificate of Survey I hereby certify that I am a licensed surveyor and have surveyed the herein described property, that the plan conforms to said survey, and that same is true and correct. Surveyor No. _____ Certificate of Survey I hereby certify that I am a registered Engineer licensed to do surveying under the laws of the State of West Virginia that I have surveyed the herein described property, that the plan conforms to the said survey, and that the same is true and correct. Engineer West Virginia Registration No. _____ (3) Sanitary sewerage. The certification for sanitary sewerage shall be one of the following certificates: Certificate of Approval of Subsurface Sewage Disposal Systems This is to certify that this development is generally satisfactory for subsurface sewage disposal systems on the property. Date _____ _____ Cabell Huntington Health Department Certificate of Approval for Sanitary Sewers This is to certify that the development shown hereon is approved subject to the installation of sanitary sewers and treatment facilities and that such installation shall be in accordance with state and local regulations. Date _____ _____ West Virginia State Health Department Certificate of Approval of Lot for Recording This is to certify that the lot shown hereon is approved for recording and that no sewage treatment facilities are required. Date _____ _____ West Virginia State Health Department (4) Acceptance of streets. The city shall certify the acceptance of streets and roads as follows: Certificate of Acceptance of Roads This is to certify that the Director of Public Works/City Engineer has inspected the grade and drainage in this Development, and the roads are hereby accepted by the Engineer subject to any surety bond or certified checks in the Engineer's office for completion of roadway pavement. Date _____ _____ Director of Public Works/City Engineer (5) Approval for recording. Upon approval and certification of all elements of the final plan, the planning commission shall certify the plan for recording as follows: Certificate of Approval for Recording This is to certify that the development plan shown hereon has been found to comply with the Development Regulations of Huntington and with existing official plans with the exception of such variances and stipulations, if any, as noted in the minutes of the Planning Commission of Huntington, West Virginia, and that said plan is hereby approved for recording in the Office of the County Clerk. Date _____ _____ Planning Commission (6) Protective covenants. When the developer intends to regulate land use in the development and otherwise protect the development by the use of covenants, one copy of the final protective covenants shall be submitted as part of the final plan materials.

(Ord. 12-26-00)

Ask a question about Huntington law

Corpus searches the Huntington sections it holds and shows the ones that match, with their citations. Free, no sign-in.