For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 969.11 — MONITORING OF DISCHARGES

Codified Ordinances of the City of Huntington, West Virginia (Codified through Ordinance No. 2025-O-31, adopted September 22, 2025. (Supp. No. 8)) · Huntington Codified Ordinances § 969.11

Corpus is an independent public-information project, not the official City of Huntington website. Stable reference: corpuslaw.us/code/7577a789-7e4a-4be9-9dc0-44e7588498cf

969.11 - MONITORING OF DISCHARGES.

(a) Applicability: This section applies to all facilities that have stormwater discharges associated with industrial activity, including construction activity. (b) Access to facilities: (1) The Huntington Stormwater Board shall be permitted to enter and inspect facilities subject to regulation under this article as often as may be necessary to determine compliance with this article. If a discharger has security measures in force which require proper identification and clearance before entry into its premises, the discharger shall make the necessary arrangements to allow access to representatives of the sanitary board. (2) Facility operators shall allow the Huntington Stormwater Board ready access to all parts of the premises for the purposes of inspection, sampling, examination, and copying of records that must be kept under the conditions of an NPDES permit to discharge stormwater, and the performance of any additional duties as defined by state and federal law. (3) The Huntington Stormwater Board shall have the right to set up on any permitted facility such devices as are necessary to conduct monitoring and/or sampling of the facility's stormwater discharge. (4) The Huntington Stormwater Board has the right to require the discharger to install monitoring equipment as necessary. The facility's sampling and monitoring equipment shall be maintained at all times in a safe and proper operating condition by the discharger at its own expense. All devices used to measure stormwater flow and quality shall be calibrated to ensure their accuracy. (5) Any temporary or permanent obstruction to safe and easy access to the facility to be inspected and/or sampled shall be promptly removed by the operator at the written or oral request of the Huntington Stormwater Board and shall not be replaced. The costs of clearing such access shall be borne by the operator. (6) Unreasonable delays in allowing the Huntington Stormwater Board access to a permitted facility is a violation of a stormwater discharge permit and of this article. A person who is the operator of a facility with a NPDES permit to discharge stormwater associated with industrial activity commits an offense if the person denies the Huntington Stormwater Board reasonable access to the permitted facility for the purpose of conducting any activity authorized or required by this article. (7) If the Huntington Stormwater Board has been refused access to any part of the premises from which stormwater is discharged, and he/she is able to demonstrate probable cause to believe that there may be a violation of this article, or that there is a need to inspect and/or sample as part of a routine inspection and sampling program designed to verify compliance with this article or any order issued hereunder, or to protect the overall public health, safety, and welfare of the community, then the sanitary board may seek issuance of a search warrant from any court of competent jurisdiction.

(Ord. of 10-22-12(1); Ord. No. 2023-O-20, 10-10-23; Ord. No. 2024-O-04, § 1(Exh. A), 2-26-24)

Ask a question about Huntington law

Corpus searches the Huntington sections it holds and shows the ones that match, with their citations. Free, no sign-in.