For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 12.12.080 — Curbcut and driveway construction

Municipal Code of the City of Casper, Wyoming (Codified through Ordinance No. 06-26, adopted July 7, 2026. (Supp. No. 97)) · Casper Municipal Code § 12.12.080

Corpus is an independent public-information project, not the official City of Casper website. Stable reference: corpuslaw.us/code/70bbb28f-7fed-4aab-8587-3262e564be0d

12.12.080 - Curbcut and driveway construction.

All curbcuts and driveway aprons constructed or altered in the street right-of-way shall conform to the regulations set out in this chapter. A. All work covered under this chapter shall be completed expeditiously, in order to avoid unnecessary inconvenience to traffic and pedestrians. In the event that the work has not been performed in accordance with this chapter, or has been abandoned without due cause, the city manager or his/her designee may given written notice to the owner of the permit to correct the work and complete all restoration as required by this chapter. The owner shall, within ten working days from the date of notice, respond to the city with a schedule to complete the work. All work must be completed within four months from the date of the city's notice. In the event the owner does not complete the work within the time specified in the response, then the city may cause the work to be corrected and complete restoration as required by this chapter. B. In the event the city accomplishes the work in accordance with this section, the entire cost of such work, including any materials used thereof, shall be paid to the city by the applicant of the permit upon demand. If payment is not made within ten days of the demand, no additional permits shall be issued to the applicant. In addition, the city may proceed to collect any of the costs due and owing in any manner allowed by law. C. The asphalt pavement shall be cutback and removed, by the contractor, eighteen inches from all newly constructed structures to a depth of not more than ten inches. Should concrete pavement be encountered during asphalt removal, all asphalt above the concrete pavement shall be removed no matter the depth. Concrete paving shall be allowed to remain. The asphalt pavement that is removed shall be replaced and compacted with temporary base course to the top of the existing asphalt surface. The temporary base course shall be removed and replaced with asphalt pavement. The contractor shall give notice to the city when construction is complete. 1. For any such work being replaced in a residential district (R-1, R-2, R-3, R-4, R-5 and R-6 districts), the city will remove the temporary base course and replace it with asphalt paving for homeowners, in order to encourage reconstruction of damaged structures in residential areas. Replacement of base course with asphalt for structures in conjunction with a site plan, subdivision construction, or any other city permits such as a building permit for new residential or commercial construction, will be completed by a contractor, and reviewed by the city engineer or his designee prior to the work being completed. 2. The city engineer may grant exceptions to cut back the eighteen inches of asphalt, where the asphalt is in exceptionally good condition, as determined by the city engineer's office. Requests for exceptions to the eighteen inch cut back requirement must be made to the city engineering office a minimum of three days prior to the structure construction. 3. During winter months or when asphalt material is not available, the applicant or his designee shall be responsible for maintenance of all areas where pavement was removed for the installation of any structure. Maintenance shall consist of backfilling all areas where asphalt or concrete was removed with base course and replacing material as needed to prevent potholing, washouts or hazards. D. The use of asphalt, concrete, metal plates or pipes in flow lines to serve as a curbcut is prohibited on collector, arterial and snow route streets. E. On all other streets, upon notification by the city, all metal plates, pipes or other gutter obstructions shall be removed from the public right-of-way during municipal street construction or improvement projects. In the event that the metal plates or obstructions are not removed expeditiously, the city shall remove the metal plates or obstructions from the public right-of-way. Metal plates removed by the city will be returned upon payment of the costs incurred by the city for removal, storage and return of the metal plates. The property owner assumes responsibility for the installation of metal plates returned by the city. F. It shall be the duty of the person doing the work authorized by a permit to notify the city that such work is ready for observation. Every request for observation shall be filed at least one working day before such inspection is desired.

(Ord. 20-99 § 1 (part), 1999)

Ask a question about Casper law

Corpus searches the Casper sections it holds and shows the ones that match, with their citations. Free, no sign-in.