For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 13.36.020 — Application—Contents—Issuance procedure

Municipal Code of the City of Casper, Wyoming (Codified through Ordinance No. 06-26, adopted July 7, 2026. (Supp. No. 97)) · Casper Municipal Code § 13.36.020

Corpus is an independent public-information project, not the official City of Casper website. Stable reference: corpuslaw.us/code/374aad5a-644a-4ed0-aa1d-c90e39e529e9

13.36.020 - Application—Contents—Issuance procedure.

A. At least ninety days prior to commencement of discharge, new sources and sources that become I.U.s subsequent to the promulgation of an applicable categorical standard, or industrial users identified in Section 13.36.010, shall be required to file with the city an application, in the form prescribed by the city or city manager, which shall be accompanied by a fee as set by resolution adopted by the city council. New sources shall give estimates of the information requested if applicable. In support of the application, the user shall submit, in units and terms appropriate for evaluation, the following information: 1. Name, address and location of the facility at which wastewater is generated (if different from the address); 2. NAICS number according to the North American Industrial Classification System, Bureau of the Budget, as amended; 3. Wastewater constituents and characteristics including, but not limited to, those mentioned in Sections 13.32.030 and 13.32.040 of this chapter, as determined by a reliable analytical laboratory; sampling and analysis shall be performed in accordance with procedures established by the EPA pursuant to Section 304(H) of the Act and contained in 40 CFR, Part 136, as amended; 4. Time and duration of contribution; 5. Average daily, and maximum daily peak wastewater flow rates, including daily, monthly and seasonal variations, if any, from each of the following: a. Regulated process streams, b. Other streams as necessary to allow the use of the combined waste stream formula of 40 CFR, Section 403.6(e), Verifiable estimates of these flows may be allowed where justified by cost or feasibility; 6. Site plans, floor plans, mechanical and plumbing plans, and details to show all sewers, sewer connections, and appurtenances by the size, location and elevation; 7. Description of activities, facilities, and plant processes on the premises including all materials, which are or could be discharged; 8. The user shall identify the pretreatment standards applicable to each regulated process. The user shall submit the results of sampling and analysis identifying the nature and concentration (or mass, where required by the standard or city) of regulated pollutants in the discharge from each regulated process. Both daily maximum and average concentration (or mass, where required) shall be reported. The sample shall be representative of daily operations and at a minimum shall include the following: a. For sampling required in support of baseline monitoring and ninety-day compliance reports in this section and Section 13.36.080, a minimum of four grab samples must be used for pH, cyanide, total phenols, oil and grease, sulfide, hexavalent chromium and volatile organics for facilities which historical sampling data do not exists; for facilities for which historical sampling data are available, the city may authorize a lower minimum. For all other pollutants, twenty-four hour composite samples must be obtained through flow-proportional composite sampling techniques where feasible. The POTW may waive flow-proportional composite sampling for any industrial user that demonstrates that flow-proportional sampling is infeasible. In such cases, samples may be obtained through time-proportional composite sampling techniques or through a minimum of four grab samples, over the normal workday operation, where the user demonstrates that this will provide a representative sample of the effluent being discharged, b. The user shall take a minimum of one representative sample to compile that data necessary to comply with the requirements of this subdivision, c. Samples should be taken immediately downstream from pretreatment facilities if such exist or immediately downstream from the regulated process if no pretreatment exists. If other wastewaters are mixed with the regulated wastewater prior to pretreatment, the user should measure the flows and concentrations necessary to allow use of the combined waste stream formula of 40 CFR, Section 403.6(e), in order to evaluate compliance with the pretreatment standards. Where an alternate concentration or mass limit has been calculated in accordance with 40 CFR Section 403.6(e), this adjusted limit along with supporting data shall be submitted to the POTW, d. Sampling and analysis shall be performed in accordance with the techniques prescribed in 40 CFR, Part 136, and amendments thereto. Where 40 CFR, Part 136, does not contained sampling or analytical techniques for the pollutant in question, or where the approval authority determines that the Part 136 sampling and analytical techniques are inappropriate for the pollutant in question, sampling and analysis shall be performed by using validated analytical methods or any other applicable sampling and analytical procedures, including procedures suggested by the POTW or other parties, approved by the approval authority, e. The POTW may allow the submission of a baseline report which utilizes only historical data so long as the data provides information sufficient to determine the need for industrial pretreatment measures, f. The report shall indicate the time, date, and place of sampling, and methods of analysis, and shall certify that such sampling and analysis is representative of normal work cycles and expected pollutant discharges to the POTW; 9. If additional pretreatment and/or operation and maintenance (O&M) will be required to meet the categorical standards, comply with this chapter, or permit requirement, the shortest schedule by which the user will provide such additional pretreatment. The scheduled completion date shall not be later than the compliance date established for the applicable categorical standard. The following conditions shall apply to this schedule: a. The schedule shall contain increments of progress in the form of dates for the commencement and completion of major events leading to the construction and operation of additional pretreatment required for the user to meet the applicable categorical standards (e.g., hiring an engineer, completing preliminary plans, completing final plans, executing contract for major components, commencing construction, completing construction, etc.), b. No increment referred to in paragraph (a) of this subdivision shall exceed nine months, c. Not later than fourteen days following each date in the schedule and the final date for compliance, the user shall submit a progress report to the city including as a minimum, whether or not it complied with the increment of progress to be met on such date and, if not, the date on which it expects to comply with this increment of progress, the reason for delay, and the steps being taken by the user to return to the schedule established. In no event shall more than nine months elapse between such progress reports to the city; 10. Each product produced by type, amount, process or processes, and rate of production; 11. Type and amount of raw materials processed (average and maximum per day); 12. Number and type of employees, and hours of operation of plant and proposed or actual hours of operation of pretreatment system; 13. A listing of any toxic pollutant which the applicant uses or manufactures as an intermediate or final product or byproduct; 14. Signature of an authorized representative of the user and certified to by a qualified professional indicating whether pretreatment standards are being met on a consistent basis and, if not, whether additional operation and maintenance and additional pretreatment is required; 15. A list of any environmental control permits by or for the facility; 16. Any other information as may be deemed by the city to be necessary to evaluate the permit application. B. Individual Wastewater Discharge Permit Decisions. The superintendent will evaluate the data furnished by the user and may require additional information. Within ninety days of receipt of a complete permit application, the superintendent will determine whether to issue an individual wastewater discharge permit [or a general permit {optional}]. The superintendent may deny any application for an individual wastewater discharge permit [or a general permit {optional}].

(Ord. 8-08 § 1, 2008; Ord. 56-00 (part), 2000) (Ord. No. 37-15, § 1, 7-19-2016)

Ask a question about Casper law

Corpus searches the Casper sections it holds and shows the ones that match, with their citations. Free, no sign-in.