For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 16.20.080 — Preparation of plat—Supporting materials

Municipal Code of the City of Casper, Wyoming (Codified through Ordinance No. 06-26, adopted July 7, 2026. (Supp. No. 97)) · Casper Municipal Code § 16.20.080

Corpus is an independent public-information project, not the official City of Casper website. Stable reference: corpuslaw.us/code/a5217b7e-3ec7-4fb6-acd6-83578bbe2c26

16.20.080 - Preparation of plat—Supporting materials.

The following supporting materials must accompany all preliminary plats: A. Three copies of a drainage study conducted and signed by a Wyoming registered professional engineer. Studies shall include: 1. Preliminary design and layout of existing and proposed storm sewer system, 2. Developed and undeveloped flow for ten-year and one-hundred-year storms, 3. Description and location of all detention ponds proposed, 4. Analysis of the capacity of the downstream system and effect of drainage system; impacts on all adjacent lands, 5. Analysis of the effect of the drainage system on the drainage basin, 6. A statement of how the drainage plan complies with the city's stormwater management master plan, 7. All calculations used to arrive at the above data, including methodology, as set forth in the city's stormwater design manual, as adopted by the council; B. Three copies of a traffic study conducted and signed by a registered professional engineer experienced in traffic engineering. Studies shall be furnished for all residential developments consisting of twenty or more dwelling units, and for all commercial and industrial sites generating more than seventy-five vehicle trips per peak hour. 1. Traffic Study. The engineer shall prepare a traffic study listing each type of land use, number of dwelling units, the number of square feet within a commercial or industrial building, the trip generation rates used and its reference within the Institute of Transportation Engineers Trip Generation Manual, most recent edition, (total daily traffic and a.m., noon, and p.m. peak hours) and the resultant trip generation entering the existing site. The related variable for each trip generation shall be identified. Trip generation values shall be calculated from the data contained in the Trip Generation Guide. In the event such data is not available for the proposed land use, the public services director shall approve estimated rates in writing prior to acceptance. 2. The traffic study shall contain information on the adjacent street system surrounding the development. Information shall consist of existing and future average daily traffic volumes. Future traffic volumes shall be forecasted for the next twenty years. The method of projection shall be approved of by the city engineer's office. All adjacent streets serving the development site shall contain the following information: a. Current and projected a.m., noon, and p.m. peak-hour traffic at street intersections, including turning movements; b. Current and projected weekend peak-hour traffic at street intersections, including turning movements (if necessary); c. Current lane configuration and traffic controls for adjacent streets serving the development; d. A site plan of the development showing adjacent land uses within one-half mile; e. Traffic control structures and signage currently installed; f. Current and future level of service for streets adjacent to the development site. The level of service for the current street traffic volume shall be based upon information found in the city's long-range transportation plan; g. The estimated average daily traffic (ADT) to be generated from the development site and its impact on the adjacent street system. The ADT volume shall be added to both the current street system and the future street system for the next twenty years; h. All current peak hour traffic volumes and street total daily traffic counts must be actual data counts not more than two years old. Peak hour volumes or street ADT's may not be extrapolated from other street intersections or systems unless approved in writing from the city engineer's office; i. A listing of all traffic accidents over the past three years at all intersections within one-quarter mile of the development; j. A site location map showing adjacent land use and zoning within one-quarter mile surrounding the proposed development. 3. The traffic study shall provide the following contents for the proposed development: a. Information on a.m., p.m., and noon peak-hour traffic volumes generated at the site for in and out traffic; b. Information on weekend peak-hour traffic generated at the site (if the proposed land use generates significantly greater traffic volumes than a.m. and p.m. peaks); c. Information on directional distribution of traffic generated at the site. Traffic generation shall be distributed for all peak-hour periods. All traffic shall be assigned and distributed to existing planned facilities in a manner consistent to the accepted traffic patterns and approved by the public services director; d. The addition of the peak-hour traffic (a.m., noon, p.m.) generated by the proposed development to existing peak-hour traffic at all intersections within one-quarter mile of the development; e. The current and future level of service for each turning movement of traffic at all signalized intersections and all major nonsignalized intersections within one-quarter mile of the development; f. Recommendations for roadway improvements whenever the street system or street intersection fall below a level of service "C." Improvements shall be recommended to accommodate existing base and future site traffic; g. Recommendations for roadway improvements whenever intersections exhibit an unusually high incidences of vehicular accidents. Improvements shall be recommended to reduce existing and future vehicular accidents. 4. Traffic Signals. All potential signalized intersections shall be placed at half-mile points. All other locations to be considered shall meet the following criteria: a. Progression band width shall be a minimum of fifty percent of the proposed cycle length in both directions, b. Cycle length shall be a maximum of one hundred twenty seconds, c. Progression speed shall be from the posted speed limit, d. Remaining time for side-street traffic must be sufficient for side-street volumes, 5. Level of Service. The design year will be approximately twenty years following construction, or at build-out. The minimum level of service for the site and nonsite traffic shall be determined by the planning director and city engineer; 6. Deleted. 7. Trip Assignment. Internal trips shall not exceed ten percent of the total volume. Nongenerated passerby traffic reductions in generation volumes may be considered if applicable. All estimates of trip distribution and assignment are subject to review and approval by the city engineer; 8. Revisions to Traffic Study. Revisions to the traffic study shall be provided as required by the city engineer. The need to require revisions shall be based on the completeness of the traffic study, the thoroughness of the impact evaluation, and the compatibility with the street plan, 9. Traffic Counts. a. All raw traffic-count data (including hourly directional counts and peak-hour turning movements) and analysis worksheets shall be provided in the appendices, b. All total daily traffic counts shall be actual machine counts and not based on factored peak-hour sampling. Latest available machine counts from The Wyoming Highway Department or the city shall be acceptable if not more than two years old. The city engineer shall conduct new machine counts, if requested, at a fee established by the city engineer, 10. Design Hour Volumes. Site design hour volumes approximating the peak-hour volume used to determine public improvements shall be estimated by one of the following: a. Existing traffic volume counts, b. Peak-hour trip generation rates, as published in the ITE Trip Generation Guide, c. By the formula: DHV = 0.10 × AADT Where DHV | = estimated hour volume AADT | = estimated annual average daily traffic 11. If, in the opinion of the public services director and community development director, a traffic study or certain portions thereof, as outlined above, are not needed, the requirements may be waived only in writing. 12. Any current or future improvements to the existing or adjacent roadway, pedestrian or traffic control system shown to be necessary as a result of the project, by the traffic study shall be the responsibility of the developer and city on a fair share basis. 13. Pedestrian Study. A pedestrian study shall be conducted and submitted. The study shall address existing pedestrian movements within one-quarter mile of the site, and project changes to pedestrian levels and movements within the area as a result of the proposed project. Modifications/additions to the pathway, sidewalk, crosswalk, signage, shelter and overpass systems required as a result of the project shall be outlined in the study. Compliance with the city of Casper regional trails plan shall be addressed by the study. 14. Review Fee. A fee shall be paid to the city for the cost of a traffic study prepared by an independent traffic engineer. The traffic engineer shall be selected by the city and shall work directly for the city in the preparation of the study. Traffic engineers interested in conducting traffic studies for the city will be invited to submit a statement of qualifications each year. The city will utilize the services of one or more of the selected engineers throughout the year in order to review traffic issues relating to development. The selected engineer shall provide the city a negotiated fee to cover the costs associated with traffic studies on each development. These fees in full will be due from the developer to the city prior to the city's issuance of a notice to proceed to the traffic engineer to prepare the traffic study. C. Three copies of the earthwork program (erosion control) permit application prepared in accordance with city ordinances; D. Three copies of street-lighting design information, to include: 1. Distance between street light poles, 2. Number of exterior lighting poles and their location, 3. Heights of poles, 4. Size and number of fixtures, and 5. Explanation of how the design conforms to the minimum lighting standards as shown in Table 16.20.080, following this section; E. Three copies of the preliminary water and sewer study prepared in accordance with the adopted policies of the Board of Public Utilities; F. General information about the project, which shall be on the plat where possible, including: 1. A general description of the project, 2. A general discussion of the public facilities and services necessary to support the project, to include: a. Description of any recreational areas and services the developer intends to provide, i.e., public or private parks, tennis courts, swimming pools, etc., b. Description of any fire lanes, fire hydrants or other fire-protection devices the developer intends to provide, c. Description of any commercial or shopping areas to be included within the development, and d. An analysis of any natural hazards which are located in the area, as identified by the adopted Natrona County Natural Geologic Hazards Study (1981); G. A Phase I environmental study prepared by an independent, qualified consultant in accordance with "Guideline for Environmental Studies" adopted by the city. If the Phase I study indicates contamination or a reasonable expectation of contamination, a Phase II study shall be provided to further identify the nature and extent of the contamination. In the event contamination is present, the city shall determine the appropriate option, including: acceptance of the property in "as is" condition; requiring clean-up prior to annexation; modification of the subdivision; rejection of the addition; or, any other option it deems appropriate for the property. Table 16.20.080 MINIMUM LIGHTING STANDARDS Required Lighting Functional Street Type | Street Widths | Functional Uses Needing Lighting | Design Traffic Volumes (ADT) | Size | Type Height | Spacing Local | 30—40′ | Guide unfamiliar drivers | NA | 9500 | 20—26′ | 250—300′ Crime safety Collector | 30—50′ | Guide unfamiliar drivers | 2,000—5,000 | 9500 | 26′ | 200—250′ Crime safety Pedestrian visibility Major Collector | 40—60′ | Headlight glare reduction | 5,000—10,000 | 22000 | 30′ | 200—250′ Pedestrian visibility Turn lane illumination Arterial | 50—70′ | Headlight glare reduction | 10,000—15,000 | 22000 | 30′ | 100—130′ Commercial glare reduction Median access visibility Pedestrian visibility Major Arterial | 60—80′ | Headlight glare reduction | 15,000+ | 22000 | 30′ | 90—100′ Commercial glare reduction Median access visibility Pedestrian visibility Major Arterial | 60—80′ | Headlight glare reduction | 15,000+ | 50000 | 40′ | 110—130′ Commercial glare reduction Median access visibility Pedestrian visibility

(Ord. 27-08 §§ 1—6, 2008; Ord. 19-00 §§ 8, 9, 2000; Ord. 14-98 § 3, 1998; Ord. 25-89 §§ 4, 7 (part), 1989; Ord. 34-84 § 1 (part), 1984: prior code § 35-15 (4))

Ask a question about Casper law

Corpus searches the Casper sections it holds and shows the ones that match, with their citations. Free, no sign-in.