12.12.070 - Utility crossings on streets and highways.

A. All utility work which takes place within the right-of-way on streets and highways within the city limits must be under the authority of the city engineer. Utilities placed under any surfaced area must be pushed or bored so that the existing pavement is not disturbed. Street cuts will be allowed when it is the only practical method of utility work. When street cuts are allowed, city specifications will be adhered to in backfilling the trench. B. Prior to issuance of the permit, the city engineer must have on file construction drawings indicating the location and nature of the work. A copy of the construction drawings showing the actual grade and alignment of the utility crossing shall be sent to the city engineer's office within ten (10) days after completion of the work. If any work is to take place within the street, the applicant must submit a traffic control plan to the city traffic engineer for approval prior to commencing work.

(2001 In-house code § 40-30)