13.12.380 - Workmanship—Inspection of work.
The permittee is required to submit detailed written specifications covering proposed methods of trenching, laying, and backfilling to the BOPU for approval. Specifications must be based upon good and acceptable engineering standards of construction and shall meet the standards and specifications established by the BOPU. Permittees shall guarantee to the BOPU that the trenching will be properly and safely done. The laying of pipe shall be properly accomplished as to pipe bedding, laying to line, grade, and tightness, backfilling around the pipe and compaction in the backfilling of the trench. Specifications shall properly address all phases of the installation of all appurtenances to sewerage facilities. When instructed by the BOPU, the permittee will not proceed with any phase of construction without a BOPU inspector being notified in advance of construction. All sewer lines must be laid from a manhole or other interception point of an existing sewer in the upgrade direction progressing from the lowest point to the terminus at the highest point. No exceptions to this rule will be allowed. Individual building stub-ins must be laid from the main sewer line toward the individual service in an upgrade direction. Inspections of all sewer lines will be performed by swabbing the sewer lines for cleanliness, lamping for straightness and approved testing for tightness.
(Ord. No. 4416, § 1, 2-28-22; 2001 In-house code § 44-77)
Ask a question about Cheyenne law
Corpus searches the Cheyenne sections it holds and shows the ones that match, with their citations. Free, no sign-in.