§ 15.08.030 — Building permit fees
Cheyenne Municipal Code, Cheyenne, Wyoming (Supp. No. 73: covering ordinances through No. 4662, passed March 23, 2026) · Cheyenne Municipal Code § 15.08.030
Corpus is an independent public-information project, not the official City of Cheyenne website. Stable reference: corpuslaw.us/code/85bf44a9-f7bb-4b25-acba-676ba21a7bef
15.08.030 - Building permit fees.
Schedule of Permit Fees. The permit fee schedule referenced in Section R108.2 of the International Residential Code, Section 109.2 of the International Plumbing Code, Section 109.2 of the International Fuel Gas Code, Section 109.2 of the International Mechanical Code, Section 108.2 of the International Existing Building Code, Section 104.1 of the International Property Maintenance Code (also referred to as the city of Cheyenne Dangerous Building Code), and the International Energy Conservation Code, Section C104/R104, shall be implemented as follows: On the first day of January 30, 2023, the following building permit fee schedule shall become effective. City of Cheyenne Building and Construction Permit Fees January 30, 2023 Total Valuation | Fee $1.00 to $500.00 | $23.50 $501.00 to $2,000.00 | $23.50 for the first $500.00 plus $3.05 for each additional $100.00, or fraction thereof, to and including $2,000.00. $2,001.00 to $25,000.00 | $69.25 for the first $2,000.00 plus $14.00 for each additional $1,000.00, or fraction thereof, to and including $25,000.00. $25,001.00 to $50,000.00 | $391.75 for the first $25,000.00 plus $10.10 for each additional $1,000.00, or fraction thereof, to and including $50,000.00. $50,001.00 to $100,000.00 | $643.75 for the first $50,000.00 plus $7.00 for each additional $1,000.00, or fraction thereof, to and including $100,000.00. $100,001.00 to $500,000.00 | $993.75 for the first $100,000.00 plus $5.60 for each additional $1,000.00, or fraction thereof, to and including $500,000.00. $500,001.00 to $1,000,000.00 | $3,233.75 for the first $500,000.00 plus $4.75 for each additional $1,000.00, or fraction thereof, to and including $1,000,000.00. $1,000,001.00 and up | $5,608.75 for the first $1,000,000.00 plus $3.65 for each additional $1,000.00, or fraction thereof. Other Inspections and Fees: Plan Review. When submittal documents are required, a plan review fee shall be paid at the time of submitting the documents for plan review. Said plan review fee shall be 65 percent of the associated permit fee as shown in this table. The plan review fees specified in this section are separate fees from the permit fees and are in addition to the permit fees. | 65% x permit fee Inspections outside of normal business hours (minimum charge — 2 hours) | $85.00 per hour Reinspection fees | $250.00 Inspections for which no fee is specifically indicated (minimum charge — ½ hour) | $85.00 per hour Additional plan review required by changes, additions or revisions to plans (minimum charge — ½ hour) | $85.00 per hour For use of outside consultants for plan checking and inspections, or both | Actual costs plus 2% of actual costs for administrative and overhead costs. The following miscellaneous fees shall be charged by the building department: A. Master Plan Review. 1. Residential. In the event an applicant wishes to construct more than one structure from essentially the same plan, the applicant may request that the plan be identified as a master plan. In order to do so, the applicant shall pay a full plan review fee for a complete code review of the plan, and the applicant shall pay a master plan fee of two hundred fifty dollars ($250.00). Subsequent reviews of the same master plan will be paid at a flat rate of one hundred fifty dollars ($150.00). 2. Commercial. The master plan option may, upon approval of the chief building official, apply to commercial projects only if the building plans are exactly the same. The master plan fee for a commercial project will be a full plan review fee, for a complete code review of the plan and the applicant shall pay a master plan fee of two hundred fifty dollars ($250.00). Subsequent reviews of the same master plan will be paid at a flat rate of twenty-five (25) percent of the original plan review fee. 3. All master plans shall expire and become null and void on the effective date of the adoption of a new edition of the codes. B. Modular and Mobilehome Set. The fee for a block and tied only support system shall be one hundred fifty dollars ($150.00). C. Temporary Certificate of Occupancy. 1. One- and Two-Family Dwellings. The temporary certificate of occupancy issuance fee for residential structures shall be three hundred dollars ($300.00) and refundable on a sliding time scale. Three hundred dollars ($300.00) is refunded if work is completed by thirty (30) days or less; two hundred dollars ($200.00) is refunded if work is completed between thirty-one (31) and sixty (60) days; one hundred dollars ($100.00) refunded if work is completed between sixty-one (61) and ninety (90) days. After ninety (90) days no fees will be refunded. The owner, or authorized agent, shall obtain a final certificate of occupancy prior to the expiration of ninety (90) days from date of the original temporary certificate of occupancy. The building official shall seek legal remedies for failure to obtain the required certificate of occupancy after ninety (90) days, as per Section 1.24.010 of city code. 2. Commercial Structures. The temporary certificate of occupancy issuance fee for commercial structures shall be one thousand two hundred and fifty dollars ($1,250.00) and refundable on a sliding time scale. One thousand two hundred and fifty dollars ($1,250.00) is refunded if work is completed by thirty (30) days or less; one thousand dollars ($1,000.00) is refunded if work is completed between thirty-one (31) and sixty (60) days; five hundred dollars ($500.00) is refunded if work is completed between sixty-one (61) and ninety (90) days. After ninety (90) days no fees are refunded. The owner, or authorized agent, shall obtain a final certificate of occupancy prior to the expiration of ninety (90) days from date of the original temporary certificate of occupancy. The building official shall seek legal remedies for failure to obtain the required certificate of occupancy after ninety (90) days, as per Section 1.24.010 of city code. Exception: Phased projects may be issued a temporary certificate of occupancy/completion for portions of the project until a final temporary certificate of occupancy/completion is issued at which time the entire project will become subject to the provisions of subsection (C)(2) of this section. 3. Penalty. The penalty for failure to convert a temporary certificate of occupancy/completion to a final certificate of occupancy/completion shall be as set forth in Section 1.24.010 of this code. D. Contractor Lists. The fee to provide a list of licensed contractors and/or qualified supervisors/masters shall be as follows: Class A Contractor | $10.00 Class B Contractor | $10.00 Plumbing Contractor | $10.00 Electrical Contractor | $10.00 Mechanical Contractor | $10.00 Refrigeration Contractor | $10.00 Class A Qualified supervisor | $10.00 Class B Qualified supervisor | $10.00 Plumbing Master | $10.00 Electrical Master | $10.00 Mechanical Master | $10.00 Refrigeration Master | $10.00 All other Class C licenses | $5.00 for each classification Class D licenses | $5.00 for each classification Class D licenses, complete listing of contractor licenses | $35.00 Class D licenses, complete listing of qualified supervisor licenses | $35.00 For a complete listing of all licensed contractors | $100.00 For a complete listing of all licensed qualified supervisor/master | $100.00 E. The fee to copy a contractor licensing board meeting, or board of appeals hearing shall be ten dollars ($10.00) for each meeting recording. F. The minimum fee for a change of use permit, where no work is being done, shall be two hundred fifty dollars ($250.00). No building undergoing a change of use shall be used or occupied until the building has been inspected, approved and a certificate of occupancy/completion has been obtained.
(Ord. No. 4485, § 1, 1-9-23; Ord. No. 4254, § 2, 12-20-18; Ord. No. 4140, § 2, 6-27-16; Ord. No. 3998, § 2, 9-9-13; Ord. No. 3864, § 3, 6-22-09; Ord. 3770 §§ 1, 2, 2007: Ord. 3509 § 1, 2002)
Ask a question about Cheyenne law
Corpus searches the Cheyenne sections it holds and shows the ones that match, with their citations. Free, no sign-in.
