Sec. 44-468. - Right-of-way permit.
The city's transportation division of the public works department monitors and oversees utility work through the right-of-way permitting process. This includes management of facilities placed in, on, under, or over the public rights-of-way to minimize congestion, inconvenience, deterioration, visual impact and other adverse effects along with the costs to the citizens resulting from the placement of said facilities within the public rights-of-way. Right-of-way permits govern the use and occupancy of the public rights-of-way and conserve the limited physical capacity of the public rights-of-way within the city.
(1) Permit requirements. Any work within a city owned right-of-way which disturbs pavement, curb and gutter, driveways, sidewalks, landscaping, irrigation, or grass areas requires a permit.
a. Application fee and costs. Any utility company seeking to place, replace or alter facilities on, in, under, or over the public rights-of-way, shall pay a cost-based construction permit application fee of $400.00, excepting: 1) certified telecommunication providers and their contractors pursuant to V.T.C.A, Local Government Code ch. 283; and 2) holders of a state-issued certificate of franchising authority to provide cable or video services pursuant to V.T.C.A, Utilities Code ch. 66. If there are any other direct costs to the city in processing the application, the city may recover said costs from the applicant prior to the issuance of the permit.
b. Construction permit application.
1. An application shall be filed with the executive director of the public works department or designee. An applicant, by submitting such application, agrees to abide by the terms and provisions of this article pertaining to the use of the public rights-of-way.
2. The application shall identify the applicant and all affiliates that may have physical control of facilities within the public rights-of-way, with plans of the proposed work description of services to be provided as detailed in subsection 44-275(6). Applicants shall submit one set of construction plans in an electronic format acceptable to the executive director of public works or designee. Construction plans shall clearly display footage, reference points, tie-ins and proposed alignments of all items being constructed. It is recommended that plans be drawn to scale but if not, they shall be of a size and of sufficient detail that is reasonably clear and readable. These plans must be stationed and show all features located within seven feet on either side of a proposed facility. The features that are required to be shown on these plans include existing underground and aerial wires or conduits, ducts, poles, wires, waterlines, wastewater lines, stormwater lines, fire hydrants, curb inlet, curb and gutter, driveways, sidewalks, ADA ramps, traffic signals, edge of pavement and width of right-of-way. Traffic control plans shall also be submitted and be in conformance with the latest revision of the Texas Manual on Uniform Traffic Control Devices (M.U.T.C.D). All contractors listed on the permit application shall be registered with the city prior to performing any work.
c. Permittee responsibility. The permittee agrees to comply with all the following requirements:
1. Always have a copy of the approved construction permit and plans at the construction site and made available for inspection by the executive director of the public works department or designee all times when construction or installation work is occurring.
2. No deviation whatsoever from the approved permit shall be allowed without approval in writing of a permit amendment or revision to the city. When conditions warrant, such permit amendment may be accomplished in the field as an "as-built" reference.
3. All construction or installation work authorized by an approved permit must be completed in the time specified in the permit. If the work cannot be completed in the specified time periods, the permittee may request an extension. The permittee shall notify the city's contact specified on the approved permit application at least one business day and no more than three business days prior to beginning the work authorized by the permit, or prior to continuing the work if work has been suspended for more than three business days.
4. Permittees must warranty the repairs for no less than two years. If the microtrench requires repairs before the remainder of the warranty period and qualifies for resurfacing, then the permitted utility company shall be responsible for making subsequent repairs by like methods or by City of Round Rock Design and Construction Standards.
5. Should a permitted utility company fail to maintain, repair, or reconstruct any such surface within ten days after written notice from the city's executive director of the public works department or designee, the city may have such surface(s) repaired or reconstructed and will charge the cost of said repairs including any cost associated with the materials used in the restoration, to the owner or company responsible for the initial repair(s).
6. All microtrench installed utilities must be able to be located by calling 811 locating system.
7. At no cost to the city, the permittee must replace any fiber/conduit that is damaged or destroyed due to any city infrastructure maintenance or installation activities performed by any/all city agencies. This shall include activities necessary to maintain water distribution system, sanitary sewer system, stormwater infrastructure, sidewalks, ADA ramps, roadway paving maintenance, signal installation, or other activities that may commence at the sole discretion of the city.
8. At no cost to the city, the permittee must replace all existing fiber/conduit damaged or destroyed in the furnishing zone or shoulder of the roadway and ditch lines within the city-owned right-of-way.
9. The permittee shall be liable and responsible for all microtrenching excavations in the roadway that are not backfilled, which may cause a hazard to pedestrians, bicycles, and nonvehicular activities.
10. The city shall not be responsible for any damage claims resulting from the installation of cable/conduits via microtrench construction activities by the permittee, its contractor, and or others within the project areas.
(Ord. No. O-2025-255, § I, 10-9-2025)