Supplementary requirements for microtrenching within the right-of-way.
Round Rock Code of Ordinances § 44-469
in effectSec. 44-469. - Supplementary requirements for microtrenching within the right-of-way.
(a) When using a microtrench, the permittee may follow traditional pavement repair guidelines or, if requested and approved by the executive director of public works or designee, may use alternative crack filling methods.
(b) The city shall allow microtrenching construction in the right-of-way at a depth and configuration as shown in the standard detail drawings MT-01, MT-02, MT-03 and MT-04, on file and available from the executive director of the public works department or designee.
(c) If requested in writing, the city shall notify all microtrench installation utility companies of the upcoming year's paving and infrastructure maintenance plans to allow the utility companies time to relocate or protect its utility prior to starting construction. No microtrench shall be allowed on any new asphalt roadways.
(d) The city's transportation division of the public works department collects pavement condition data on a two- to five-year cycle. In the event that the microtrench is found to be failing or in disrepair, the contractor on the approved permit and permitted utility company will be contacted to make the required repairs.
(e) At no cost to the city, the permittee must provide permanent on-going maintenance and repairs for any failures directly related to the fiber/conduit routes in the project areas. Maintenance shall include providing materials and labor to properly maintain in good condition pavement, sidewalks, curb and gutter, shoulders, ditch lines, and softscape areas (dirt and grass) per the City of Round Rock Design and Construction Standards.
(f) The city's right-of-way inspection personnel must be notified by the permittee's contractor no less than 24 hours prior to the request for any inspections.
(g) Existing pavements, base courses, curb and gutters, sidewalks, and ADA ramps must be cut and brought to a neat line by use of a saw, air hammer, or other suitable equipment. All expansion joints removed must be replaced with like materials or an approved cementitious or asphaltic patch material.
(h) Microtrenches are required to be installed at the edge of the gutter line and asphalt interface. Areas of roadways without curb and gutter, the trench will be in the softscape area three feet from the edge of asphalt. The trench must be linear in nature and have a shape consistent with the roadway's horizontal alignment. Trenching of concrete roadways, curb and gutter, and valley gutters is prohibited.
(i) For all microtrenches installed in the roadway asphalt pavement adjacent to the gutter, the width must be one and one-half inches to three inches in width and be 12 inches to 18 inches in depth on arterial and collector roadways; ten inches to 18 inches in depth on residential roadways. The microtrench must be filled with 1,000 psi to 1,200 psi flowable fill, or approved equal material, the same day the conduit/fiber is installed.
(j) Lane closures on major thorough fares will be limited to between 9:00 a.m. to 4:00 p.m. Monday through Friday unless the executive director of the public works department grants prior approval. All traffic control devices shall conform to the Texas M.U.T.C.D, provided that the city may dictate restrictions due to rush hour traffic, unique events, rain or ice events, or other conditions that may warrant such restrictions.
(k) Working hours in the public right-of-way are limited to the hours between 7:00 a.m. to 6:00 p.m. Monday through Friday. When working on Saturdays or city-observed holidays, 72 hours advance notice shall be given and approved by the executive director of public works in advance. Saturday and city-observed holidays, working hours are limited to 9:00 a.m. to 6:00 p.m. Sunday work is discouraged. No micro trenching on weekends or city holidays.
(l) Erosion control measures, advanced warning signs, markers, cones, and barricades must be in place prior to work beginning.
(m) The permittee shall insure that dust control and good housekeeping measures are implemented at the site.
(n) The permittee shall have a dedicated concrete wash out area per TCEQ requirements. Washing out on roadways or grassy areas is prohibited.
(o) Construction equipment shall not be left by the permittee in city rights-of-way or impede traffic by blocking city streets or driveways.
(p) The permittee shall always maintain access to properties adjacent to the work. The permittee shall control the parking of its employees' vehicles and equipment not in use.
(q) All backfill of excavations shall be compacted in lifts no more than 12 inches of pre-compacted thickness to the acceptance of the city inspector.
(r) All excavations must be closed by the end of each workday or properly barricaded and/or plated.
(s) No excavations may be left open overnight, weekend, or holiday unless approval barricading, plating, fencing and safety plan has been requested by permittee and approved by the executive director of the public works department or designee.
(t) Site clean-up by the permittee shall include dress-out to pre-existing grades, erosion controls, fertilizer, grass seeding or sodding, removal, and disposal of spoils, and sweeping and washing of the pavement. Grassy areas disturbed during construction will also be included in the site clean-up.
(Ord. No. O-2025-255, § I, 10-9-2025)