§ 17.48.110 — CLEANOUT REQUIREMENTS
City Code of Salt Lake City, Utah (2026 S-21: current through Ord. 49-26, passed September 15, 2026) · Salt Lake City Code § 17.48.110
Corpus is an independent public-information project, not the official City of Salt Lake City website. Stable reference: corpuslaw.us/code/03d58ecf-f630-4bfd-9a44-4ee4be1d50a8
17.48.110: CLEANOUT REQUIREMENTS:
A cleanout "wye" must be located immediately at the property line or as approved by the director. In all cases, the cleanout pipe from the "wye" to the surface of the finished grade must be iron or other material approved by the director, and on a slope of forty five degrees (45°). The cover must be a city director approved cleanout plug. Additional cleanouts shall be placed a minimum of fifty feet (50') apart along any four inch (4") building sewer, and every one hundred feet (100') along any six inch (6") building sewer, and at all other changes in direction. Cross supports for cleanouts shall be eighteen inches (18") below the cleanout tops. No waste or soil shall enter cleanout pipes. A test tee shall be required at or near the property line or wye as required by inspector. (Ord. 36-93 § 6, 1993: prior code § 37-3-13)
Ask a question about Salt Lake City law
Corpus searches the Salt Lake City sections it holds and shows the ones that match, with their citations. Free, no sign-in.
