§ 25-8 — Use of rights-of-way
Code of Ordinances, City of Cape Coral, Florida (Supp. No. 39, Update 1; codified through Ordinance No. 45-26, enacted September 3, 2026) · Cape Coral Code of Ordinances § 25-8
Corpus is an independent public-information project, not the official City of Cape Coral website. Stable reference: corpuslaw.us/code/07790769-8c43-4644-afe2-22f6ffa59c28
§ 25-8 - Use of rights-of-way.
(a) A facility owner agrees at all times to comply with and abide by all applicable provisions of federal law, the state statutes and local laws including, but not limited to, applicable zoning regulations not inconsistent with state and federal laws. (b) Except in the case of an emergency, which shall include without limitation an out of service condition affecting 911 service, and which shall require subsequent notification to the city, no telecommunications service provider shall construct any facility under or within any public rights-of-way which disrupts the public rights-of-way without first filing an application with and obtaining a permit from the city, pursuant to applicable permitting requirements of the city except as otherwise provided in this chapter. In case of the repair or maintenance of an existing facility, the city may impose lesser requirements than those set forth herein. Unless otherwise required by the city code, no permit shall be required for installation and maintenance of service connections to customers' premises where there will be no disruption of the public rights-of-way. (c) As part of any permit application, the facility owner shall provide a proposal for construction of the telecommunications facility that sets forth at least the following: (1) The location of the proposed facility, including a description of the facilities to be installed, where it is to be located, and the approximate size of facilities and equipment that will be located in the public rights-of-way; (2) A description of the manner in which the system will be installed (i.e., anticipated construction methods and/or techniques), the time required to construct the system, a maintenance of traffic plan for any disruption of the public rights-of-way, information on the ability of the public rights-of-way to accommodate the proposed system, if available (such information shall be provided without certification as to correctness, to the extent obtained from other users of the public rights-of-way); and (3) If appropriate, given the system proposed, an estimate of the cost of restoration to the public rights-of-way. The plan shall include the timetable for construction for each phase of the project, and the areas of the city which will be affected. (d) The city may request such additional information as it finds reasonably necessary to review an application for a permit to perform work in the public rights-of-way. The city shall have the power to prohibit or limit the placement of new or additional facilities within the public rights-of-way if there is insufficient space to accommodate all of the requests to occupy and use the public rights-of-way, for the protection of existing facilities in the public rights-of-way, or future city plans for public improvements or development projects which have been determined by the city to be in the public interest. (e) All facilities shall be installed, located and maintained so as not to unreasonably interfere with the use of the public rights-of-way by the public and to cause minimum interference with the rights and convenience of property owners who adjoin any of the public rights-of-way. The registrant shall be liable for the displacement, damage or destruction of any private property within or adjoining the public rights-of-way. The use of trenchless technology (i.e., directional bore method) for the installation of facilities in the public rights-of-way as well as joint trenching and/or the co-location of facilities in existing conduit is strongly encouraged, and should be employed wherever feasible. The City Manager may promulgate such rules and regulations concerning the installation and maintenance of a telecommunications facility in the public rights-of-way, as may be consistent with applicable law and not inconsistent with this chapter. (f) All safety practices required by applicable law or accepted industry practices and standards shall be used during construction, maintenance and repair of the telecommunications facilities. (g) In the event that at any time during the term of the rights granted herein the city shall awfully elect to alter or change the grade of any public rights-of-way, upon reasonable notice by the city, the facility owner shall make any necessary removals, relaying and relocations of its telecommunications facilities at its own expense, in accordance with applicable Law. (h) A facility owner shall obtain any and all required permits and pay any and all required fees before commencing any construction on or otherwise disturbing any public rights-of-way as a result of its construction, except as provided herein. The facility owner shall, at its own expense, restore the property to as good a condition as existed prior to commencement of work. A registrant shall guarantee its restoration for a period of 12 months after the completion of such restoration. If the restoration is not performed in a reasonable and satisfactory manner to the city within 30 calendar days after the completion of construction, the city may, after prior written notice to registrant, cause the repairs to be made at the facility's owner expense utilizing city employees, agents or contractors; charge any and all costs against the registrant; and require reimbursement within 30 days after the submission of the bill by the city to registrant. Rates for labor and equipment shall be in accordance with City of Cape Coral regulations, if applicable. A permit from the city constitutes authorization to undertake only certain activities on public rights-of-way in accordance with this chapter, and does not create a property right or grant authority to impinge upon the rights of others who may have an interest in the public rights-of-way. (i) All ongoing installation, construction and maintenance of a telecommunications facility located in the public rights-of-way shall be subject to the city's periodic inspection, upon no less than three days written notice to the facility owner, for compliance with this chapter, or any applicable provisions of the city code and/or administrative regulations. (j) A facility owner shall not place its facilities so as to interfere unreasonably with any other person lawfully using the public rights-of-way of the city. (k) A facility owner shall cooperate with the city by providing timely and complete information requested under this subsection. Upon completion of any installation or construction of new facilities in public rights-of-way, at no cost to the city, the facility owner shall provide such information, as may be requested, showing the exact location of its facilities and structures, including but not limited to, as-built plans, maps, geographical information systems, plats, construction documents, drawings and any other information the city may find reasonably necessary. The plans shall be provided in digitized format showing the two-dimensional location of the facilities based on the city's geographical database datums, or other format acceptable to the City Manager. All information required by this section shall be maintained in accordance with F.S. § 202.195. (l) Suspension or denial of permits. Subject to subsection (m) below, the City Manager or a designee may suspend or deny a permit for work in the public rights-of-way for one or more of the following reasons: (1) Violation of permit conditions, including conditions set forth in this chapter or other applicable provisions of the city code or regulations governing use of public rights-of-way; (2) Misrepresentation or fraud by registrant in a registration or permit application to the city; (3) Failure to relocate or remove facilities as may be lawfully required by the city; or (4) Failure of registrant, its employees, agents or subcontractors, in connection with the subject permit, to: a. Place barricades or signs around the work area; b. Take reasonable safety precautions to alert the public of work at the work site; or c. Repair or replace and restore any sidewalk, street, alley, pavement, water, sewer or other utility line or appurtenance, soil, landscaping, dirt or other improvement, property or structure of any nature. In the event of such failure, the city may perform the work utilizing city employees, agents or contractors; charge any and all costs against the registrant; and require reimbursement within 30 days after the submission of the bill by the city to registrant. Rates for labor and equipment shall be in accordance with City of Cape Coral regulations, if applicable. (m) Immediately after the suspension or denial of a permit pursuant to this section, the city shall provide written notice of the violation, which notice shall contain a description of the violation. Final, written decisions of the city suspending a permit or denying an application for a registration are subject to appeal. An appeal must be filed with the city within 30 days of the date of the final, written decisions to be appealed. Any appeal not timely filed as set forth above shall be waived. The City Council shall hear the appeal no later than 45 days from the end of the 30 day appeal period, unless waived by the registrant. Upon correction of any violation that gave rise to a suspension or denial of permit, the suspension or denial shall be lifted. (n) In the event registrant desires to use its existing facilities or to construct new facilities for the purpose of providing other utility or non-utility services to existing or potential consumers or resellers, by providing cable services, or any other services other than the provision of telecommunications service, or for providing any other use to existing or potential consumers, a registrant shall seek such additional and separate authorization from city for such activities as may required by applicable law. In the event that a registrant is acting in its proprietary function as a retail provider of telecommunications equipment or appliances, registrant shall seek the appropriate permits and licenses from the city. (o) To the extent that any person or registrant leases or otherwise uses the facilities of an entity that is duly registered or otherwise authorized to place and maintain facilities in the public rights-of-way of the city, the person or registrant shall make no claim, nor assert any right, which will impede the lawful exercise of the city's rights, including requiring the removal of such facilities from the public rights-of-way of the city, regardless of the effect on the person's ability to provide service or on the registrant's ability to maintain its own telecommunications facilities in the public rights-of-way of the city. (p) Termination of registration. The involuntary termination of a registration may only be accomplished by an action of the City Council. The city may declare the registration terminated and revoke and cancel all privileges granted under that registration if a federal or state authority suspends, denies or revokes a registrant's certification to provide telecommunications service; if the registrant's use of the public right-of-way presents an extraordinary danger to the general public or other users of the right-of-way; or if the registrant abandons all of its facilities. Prior to the termination by the city resulting from a violation of any of the provisions of this subsection, the registrant shall be notified by the City Manager with a written notice setting forth all matters pertinent to the violation, and describing the action of the city with respect thereto. The registrant shall have 60 days after receipt of the notice within which to cure the violation, or within which to present a plan, satisfactory to the City Council, to accomplish the same. In the event of the termination, the registrant shall, within a reasonable time following the termination, remove or abandon the facilities and take such steps as are necessary to render every portion of the facilities remaining within the public right-of-way of the city safe. If the registrant has either abandoned its facilities or chooses to abandon its facilities, the city may either require the registrant's bonding company to remove some or all of the facilities from the public right-of-way and restore the public right-of-way to its proper condition or the city may require that some or all of the facilities be removed and the public right-of-way restored to its proper condition at the registrant's expense, utilizing city employees, agents or contractors, and charge any and all costs against the registrant and require reimbursement. Rates for labor and equipment shall be in accordance with City of Cape Coral regulations, if applicable. The obligations of the registrant hereunder shall survive the termination of the registration. In the event of a termination of registration, this provision does not permit the city to cause the removal of any facilities that are used to provide another service for which the registrant holds a valid certification with the governing federal and state telecommunications agencies and is properly registered with the city, for the certificated service, under this chapter.
(Ord. 119-00, 12-18-2000)
Ask a question about Cape Coral law
Corpus searches the Cape Coral sections it holds and shows the ones that match, with their citations. Free, no sign-in.
