§ 10.36.070 — Trench Excavation

Spokane Municipal Code; partial · SMC 10.36.070 · Effective

Corpus is an independent public-information project, not the official City of Spokane website. Stable reference: corpuslaw.us/code/0e17b3be-b5ad-4da8-9d32-007b943b6cf4

Section 10.36.070 Trench Excavation

The excavator must: A. leave at least thirty feet of completed trench ahead of the pipe laying operation, except at the closing terminus, but may not leave a greater length of trench open than necessary to accommodate the length of pipe at hand ready to be put in place, and in no event more than three hundred feet; B. dig the trench at least twelve inches wider than the exterior dimension of the pipe, unless the pipe is four inches wider than the outsides of manholes and other structures; C. dig any part of a trench in a rock formation to a depth sufficient to allow six inches of bedding below the pipe and six inches of fill above the pipe; D. brace excavations in accordance with current federal and state safety standards for such construction work.

Date Passed: Monday, June 4, 2007 Effective Date: Wednesday, July 11, 2007 ORD C34041 Section 1 (Recodification)