Jackson Zoning Ordinance § 1102-A
in effecte. clearly visible warning signs shall be placed on the fence and/or site perimeter
advising of potential high voltage hazards;
f. prior to preliminary site plan approval or construction plan the applicant shall submit
proof of notice to the utility company that operates the power grid where the solar
energy production facility will be located of the intent to develop an interconnected
power generation facility;
g. prior to site construction plan approval, the applicant shall submit proof of an
executed interconnection agreement with the public utility or other written proof of
an agreement with the public utility that construction can proceed;
h. considered abandoned after a one-year period without energy production;
i. all energy production and transmission equipment and appurtenances removed
within 120 days of abandonment by the operator of the facility and the property
owner;
j. a decommissioning plan submitted with the Use Permit application for the proposed
site; and
k. the Use Permit shall be renewed annually and subsequent owners of a solar energy
production facility at the location must apply for and receive a new Use Permit.