§ 6-315 — MONITORING FACILITIES

Fresno Municipal Code (Supp. No. 55, Update 1 (online June 23, 2026): codified through Ordinance No. 2026-019) · Fresno Municipal Code § 6-315

Corpus is an independent public-information project, not the official City of Fresno website. Stable reference: corpuslaw.us/code/0ffc2658-c4b5-4447-b531-47658b8fbfd3

SEC. 6-315. - MONITORING FACILITIES.

(a) Required to Install. The Control Authority shall require the user to install sampling and/or monitoring equipment, including manholes, as necessary. The user's sampling and monitoring equipment shall be maintained at all times in a safe and proper operating condition by the user at the user's own expense. All devices used to determine wastewater flow and quality shall be calibrated, at a frequency to be determined by the Control Authority, to ensure their accuracy. The sampling and monitoring facilities shall be provided in accordance with the city's requirements and all applicable construction standards and specifications. Construction shall be completed within ninety (90) days following written notification by the Control Authority unless a time extension is granted by the Control Authority. (b) Location of Equipment. The sampling and monitoring equipment shall be situated on the user's premises, but the Control Authority may, when such a location would be impractical or cause undue hardship on the user, allow the facility to be constructed in the public right-of way and located so that it will not be obstructed by landscaping or parked vehicles. (c) Access to Equipment. If the monitoring facility is inside the user's fence, there shall be accommodations to allow access for city personnel, such as a gate secured with a city lock. There shall be ample room in or near such sampling manhole to allow accurate sampling and compositing of samples for analysis. (d) Effluent Meter and Composite Sampler. New industrial users or existing users planning a remodel of existing process facilities and/or pretreatment system which contribute high strength wastewater to the POTW shall install a nonresetable totalizing effluent meter and a flow proportioned composite sampler which is controlled by a flow meter. (e) Provisions for Existing Users. Existing industrial users shall be subject to the provisions of Section 6-315(a), (b), (c), and (d) at the discretion of the Control Authority. (f) Plan Review. Detailed plans showing the operation and proposed installation of all monitoring and/or sampling equipment shall be submitted to the Control Authority for review and shall be acceptable to the Control Authority before installation of the equipment. Any subsequent changes to any sampling and/or monitoring equipment shall be reported to and be acceptable to the Control Authority. (Added Ord. 2002-73, § 4, eff. 1-23-02).

Ask a question about Fresno law

Corpus searches the Fresno sections it holds and shows the ones that match, with their citations. Free, no sign-in.