33.654.110 Connectivity and Location of Rights-of-Way
A.
Purpose. The regulations of this section ensure provision of efficient access to as many lots
as possible, and enhance direct movement by pedestrians, bicycles, and motor vehicles
between destinations. Direct routes for bicycles and pedestrians from residential areas to
neighborhood facilities, such as schools and parks, are particularly important to increase
the convenience of travelling by foot or bicycle. Direct routes for motor vehicles are
important for reducing vehicle miles travelled and traffic congestion, which reduces air and
water pollution and carbon emissions. Connected streets provide for more efficient
provision of utility and emergency services, and also enable a more even dispersal of
traffic. The specific location of rights-of-way is influenced by a variety of conditions,
including existing development, streets and lot patterns, and environmental features.
B.
Where these regulations apply.
1.
The standards stated in Subsection C. apply to proposals for land divisions in OS, R, C,
E, CI, and IR zones. Adjustments are prohibited. For proposals that cannot meet all of
the standards, the approval criteria stated in Subsection D. apply. Where a proposal
can meet the standards, the applicant may choose to meet all of the approval criteria
stated in Subsection D. instead of all of the standards.
2.
The approval criteria in Subsection D. apply to proposals for land divisions in I zones.
C.
Standards.
1.
Through streets.
a.
Through streets must be provided where there is more than 530 feet between
through streets unless the entire site frontage is within 200 feet of the closest
intersecting edge of a through street.
b.
Measuring the distance between through streets.
(1) For the purposes of this standard, the distance between through streets is
measured from the closest intersecting edge of the through street, partial
through street, or self-contained pedestrian connection right of way in one
direction along the shared block frontage, to the closest intersecting edge of
the through street partial through street, or self-contained pedestrian
connection right of way in the opposite direction along the shared block
frontage.
(2) Dead end streets are not included in measurements between through
streets or pedestrian connections.
2. Partial streets and partial pedestrian connections.
a.
Where the block includes a partial through street and where a straight-line
extension of the partial through street would bring the street onto the site, a
partial through street is required;
b.
Where the block includes a partial pedestrian connection and where a straight-
line extension of the partial pedestrian connection would bring the connection
onto the site, a partial pedestrian connection is required; and
c.
Widening a partial street is required where a street that is not improved to its full
design width borders the edge of the land division site.
3.
Location.
a.
Through streets. When a new through streets or an extension of a partial
through street is required, the street must:
(1) Connect two or more streets when the site is abutting more than one
through street or partial through street;
(2) Be in alignment with partial through streets within the same block as the
land division site; and
(3) Extend to the boundary of the site to provide future access to adjacent sites,
either by terminating at a dividable lot or locating along the edge of the land
division site.
b.
Pedestrian Connections. When a partial pedestrian connection is required by 2.b,
the pedestrian connection must:
(1) Complete the connection between two or more streets when the existing
pedestrian connection abuts the site; and
(2) Be in alignment with partial pedestrian connections within the same block
as the land division site.
4.
Dead-end streets.
a.
Dead-end streets may be provided where through streets are not required.
Public dead-end streets may not exceed 200 feet in length or abut more than 8
lots within the land division site and must be at least 200 feet from any other
public dead-end street.
b.
Where the land division site is adjacent to sites that may be divided under
current zoning, dead-end streets and pedestrian connections must be extended
to the boundary of the site to provide future access to the adjacent sites. For the
purposes of this standard, “may be divided” does not include middle housing
land divisions.
5.
Alleys. Alleys may be provided in addition to required streets to accommodate
alternative vehicular access to proposed lots.
D.
Approval criteria.
1.
Through streets and pedestrian connections in OS, R, C, E, CI, and IR Zones. In OS, R, C,
E, CI, and IR zones, through streets and pedestrian connections are required where
appropriate and practicable, taking the following into consideration:
a.
Through streets should generally be provided no more than 530 feet apart, and
pedestrian connections should generally be provided no more than 330 feet
apart. Through street and pedestrian connections should generally be at least
200 feet apart;
b.
Where the street pattern in the area immediately surrounding the site meets the
spacing of subparagraph a., above, the existing street pattern should be
extended onto the site;
c.
Characteristics of the site, adjacent sites, and vicinity, such as:
(1) Terrain;
(2) Whether adjacent sites may be further divided;
(3) The location of existing streets and pedestrian connections;
(4) Whether narrow frontages will constrain creation of a through street or
pedestrian connection;
(5) Whether any of the following interrupt the expected path of a through
street or pedestrian connection:
•
Environmental, River Environmental, Pleasant Valley Natural Resource,
or Greenway overlay zones;
•
Tree groves;
•
Streams;
•
Combined flood hazard area; or
•
Wetlands; and
(6) Whether existing dwelling units on- or off-site obstruct the expected path of
a through street or pedestrian connection. Alternative locations or designs
of rights-of-way should be considered that avoid existing dwelling units.
However, provision of through streets or pedestrian connections should
take precedence over protection of existing dwelling units where the
surrounding transportation system will be significantly affected if a new
through street or pedestrian connection is not created;
d.
Master street plans for the area identified in the Transportation Element of the
Comprehensive Plan;
e.
Pedestrian connections should take the most direct route practicable. Users
should be able to see the ending of the connection from the entrance point,
if possible.
2.
Dead-end streets in OS, R, C, E, CI, and IR zones.
a.
In OS, R, C, E, CI, and IR zones, dead-end streets may be provided where through
streets are not required. Dead-end streets should generally not exceed 200 feet
in length, and should generally not serve more than 25 dwelling units. Public
dead-end streets should generally be at least 200 feet apart.
b.
Where the land division site is adjacent to sites that may be divided under
current zoning, dead-end streets and pedestrian connections must be extended
to the boundary of the site as needed to provide future access to the adjacent
sites. Options for access and street locations must consider the characteristics of
adjacent sites, including terrain, the location of existing dwellings, environmental
or Pleasant Valley Natural Resource overlay zoning, streams, wetlands, special
flood hazard areas, and tree groves. The following factors are considered when
determining if there is a need to make provisions for future access to adjacent
sites. A need may exist if:
(1) The site is within a block that does not comply with the spacing standards or
adopted street plan of the Transportation Element of the Comprehensive
Plan; or
(2) The full development potential of adjacent sites within the block will not be
realized unless a more complete street system is provided to improve
access to those sites.
3.
Pedestrian connections in I Zones. In I zones, pedestrian connections to all Regional
Transitways, Major Transit Priority Streets, Transit Access Streets, Community Transit
Streets, Off-Street Paths, and recreational trails within 1,300 feet of the site are
required where appropriate and practicable. The connections should take the most
direct route practicable. Users should be able to see the ending of the connection
from the entrance point, if possible. Only the portion of the pedestrian connection
that is on the land division site is required.
4.
Alleys in all zones. Alleys may be required where the provision of an alley is
appropriate to mitigate transportation or development impacts. Alleys may be
appropriate to move garage access away from busy streets, reduce the number of
driveways crossing sidewalks, provide alternative locations on the site for parking,
limit the number of garage doors facing the street, and maintain on-street parking.
Where alleys are not required, applicants may choose to provide them.