8-5-12. - Standards for Repairs and Restoration of Pavement or Sidewalks.
(a) Responsibility: The permittee or any other person performing work shall be fully responsible for the cost and actual performance of all work in the public right-of-way or public easement. Said person shall do all work in conformance with city design and construction standards. All restoration work shall result in a pavement and sidewalk condition equal to or better than that which existed prior to construction. All streets and paved surfaces shall be restored within two weeks of their excavation. Where bike lanes and multi-use paths are reopened to the public prior to final restoration, a temporary, all-weather, hard surface patch shall be provided. No person shall fail to repair or restore any public improvement damaged, removed or destroyed during the performance of any work under a permit issued pursuant to this chapter. (b) Flowable Fill Required: Flowable fill backfill material, or an equivalent backfill material approved by the city manager that provides an incompressible, settlement-free, stable surface satisfying the design and construction standards adopted by the city, shall be used to restore all trenches that have been excavated in the paved or traveled portion of any public street or alley. (c) Rock Backfill Material Permitted: The city manager may permit an applicant to use rock backfill material in lieu of flowable fill backfill material on streets that are designated "local" in the Transportation Master Plan, provided all of the following conditions are satisfied: (1) Prior to issuance of a permit for work activity in the public right-of-way or public easement, the applicant must request and receive city manager approval for the use of the rock backfill material; (2) The work activity requires trench excavation in excess of five feet in depth; (3) The trench excavation is along a parallel alignment beneath the paved roadway or travel lane, and does not include any perpendicular or diagonal trench excavation across the paved roadway or travel lane; (4) The type, gradation, placement, compaction and testing of the rock backfill material shall meet or exceed all requirements specified in the design and construction standards adopted by the city; and (5) The applicant shall warrant the restoration of the public street for a period of three years as set forth in section 8-5-6, "Public Improvement Warranty," B.R.C. 1981. (d) Subsurface or Pavement Failures: In the event that subsurface material or pavement over or immediately adjacent to any excavation should become depressed, broken or fail in any way at any time after the excavation has been completed, the city manager will notify the permittee or any other person performing work of the condition, location and required remedy for the street failure, and the permittee or any other person performing work shall repair or restore, or cause to be repaired or restored, the street failure to the satisfaction of the city manager within three days of such notice. The city manager may extend the time for the permittee or any other person performing work to repair or restore the affected public street. (e) Repair By The City: In the event that any person or permittee fails, neglects or refuses to repair or restore any condition pursuant to the city manager's notice as set forth in subsection (d) of this section the city manager may repair or restore or cause to be repaired or restored, such condition in such manner as the city manager deems expedient and appropriate pursuant to the following: (1) Any such work performed by the city shall be billed to the permittee or any other person performing work to recover the cost thereof plus up to fifteen percent of such cost for administration. The permittee or any other person performing work shall pay all such charges within thirty days of the statement date. If the permittee or any other person performing work fails to pay such charges within the prescribed time period, the city may, in addition to taking other collection remedies, seek reimbursement through the warranty guarantee; (2) The permittee or any other person performing work shall be barred from performing any work in the public right-of-way or public easement, and under no circumstance will the city issue any further permits of any kind to said permittee or any other person performing work, until such time that all outstanding charges have been paid in full; and (3) Repair or restoration by the city in accordance with this subsection shall not relieve the permittee or any other person performing work from liability for future failures at the site of the repair or restoration. Ordinance Nos. 7088 (2000); 7687 (2009)
Ask a question about Boulder law
Corpus searches the Boulder sections it holds and shows the ones that match, with their citations. Free, no sign-in.