511.220. - Rainleader disconnection permit requirement.
(a) Permit required. No person shall perform a disconnection of any rainwater pipe, rainleader, area drain or other connections used for conveying stormwater and clearwater from any building, grounds or premises from the sanitary sewer system without first having obtained a rainleader disconnection permit from the city engineer or city engineer's designee. (b) Permit expiration. Permits issued under this Section shall be valid for the period during which the proposed activity takes place or is scheduled to take place, whichever is shorter, but in no event shall a permit be valid for more than one (1) year.
(Ord. No. 2018-055, § 9, 10-19-18)
Ask a question about Minneapolis law
Corpus searches the Minneapolis sections it holds and shows the ones that match, with their citations. Free, no sign-in.