8.29.180 - Construction.
A. Each franchise agreement shall specify the time by which initial or required upgrade construction thereunder, if any, must begin, and shall specify that construction will be completed with reasonable speed, pursuant to Article XIX of the Charter. B. A grantee shall file a map and progress report with the franchise agency at the close of each calendar year, showing the exact areas of the City being served by the cable system and the location and identification of major component parts of the system. C. A grantee that is constructing its cable system for the first time shall submit monthly construction reports to the franchise agency, beginning the month after the franchise is awarded and continuing until the initial construction required in its franchise agreement is complete. Such a grantee must submit updated as-built system design maps to the franchise agency, or make them available for inspection with notice of their availability, within 30 days of the completion of system construction in any geographic area. These maps shall be developed on the basis of post-construction inspection by the grantee and construction personnel to assess compliance with system design. Any departures from design must be indicated on the as-built maps, to assist the franchise agency in assessing operator compliance with its obligations. D. A grantee shall promptly notify the franchise agency of any delays known or anticipated in the construction of its system or in providing access to said system. Notices of construction delays shall be promptly made to the Public Utilities Committee of the Board of Aldermen, or to such committee, as determined by the rules of the Board of Aldermen, having jurisdiction over cable television franchises, by the franchise agency. E. Failure on the part of a grantee to commence and diligently pursue each of the material requirements in its franchise agreement to complete construction pursuant to this section shall be grounds for termination of its franchise pursuant to Section 8.29.090; provided, however, that the City may in its discretion extend the time for the commencement and completion of construction and installation and service to subscribers for additional periods in the event a grantee, acting in good faith, experiences delays by reasons of circumstances beyond its control. F. At such time as a grantee shall become aware that circumstances beyond its control may prevent its compliance with the provisions of this section, said grantee shall immediately notify the franchise agency, in writing, as to the exact conditions responsible for such delay, and shall show the specific remedy and methods it has undertaken to correct said condition causing the unanticipated delay. Failure to file said written notification by the grantee shall constitute an act of bad faith. G. In the event the operation of any part of a franchised cable system is discontinued for a continuous period of four months, or in the event such system has been installed in any public rights-of-way without complying with the requirements of the grantee's franchise, or in the event of expiration, termination or revocation of the franchise and, where applicable, an affirmative determination by the City not to renew such franchise, the City may direct a grantee promptly to remove at grantee's cost from the public rights-of-way all such property and poles of such system or part of a system. Any property which the grantee allows to remain in place twelve months after having been notified by the City that it must be removed (or, if specific right-of-way space occupied by grantee's plant is immediately needed for purposes of providing cable service, sixty days after such notice) shall be considered permanently abandoned and shall become the property of the City subject to the provisions of any utility joint use attachment agreement.
(1994 C., § 8.29.180; Ord. No. 66084, § 3, 2003; Ord. No. 65431, § 19, 2002.)
Ask a question about St. Louis law
Corpus searches the St. Louis sections it holds and shows the ones that match, with their citations. Free, no sign-in.