Sec. 25-95. - Standards for repair and restoration.

(a) Right-of-way user responsibility. The right-of-way user shall be fully responsible for the cost and actual repairs and restoration of all work in the rights-of-way. The right-of-way user shall do all construction in conformance with any and all Denton Design Criteria or city construction standards, or other regulations. All restoration shall result in a work area condition equal to or better than the condition in which the work area existed prior to construction. In addition to the regulations, specifications, and standards referred to in subsection (a), the following provisions shall apply to work in the rights-of-way of within the city: (1) Restoration must be to the reasonable satisfaction of the city engineer and the property owner. The restoration shall include, but not be limited to: a. Replacing all ground cover with the type of ground cover damaged during work or better by sodding, as directed by the city engineer; b. Installation of all manholes and handholes, as required; c. Backfilling of all bore pits, potholes, trenches or any other holes which must be done within seven (7) business days after excavation of the bore pits, potholes, trenches or other holes, unless other an extended timeframe and safety requirements are approved by the city engineer in advance; d. Restoration of work area to city construction standards; e. Restoration of all landscaping, trees, shrubs, and sprinkler systems; and f. Repairing and replacing existing erosion control devices that have been damaged or destroyed during the work. (2) All locate flags placed in the work area at the right-of-way user's request shall be removed during the clean-up process by the right-of-way user at the completion of the work. (3) Restoration must be made in a timely manner. If restoration is not satisfactory and/or is not performed within the agreed upon timeframe, all work in progress, except that related to the outstanding restoration, including all other work areas previously permitted but not complete, may be halted and a hold may be placed on any permits not approved until all restoration is complete, or the city engineer may complete the work and bill the right-of-way user for all actual direct and indirect costs of the repairs performed by the city. (4) Emergency activity during construction. If the city determines during its regular maintenance, construction, or any similar public improvement or development project, that an emergency repair to another right-of-way user's facilities within the right-of-way is necessary to correct a situation that is hazardous to the public, the city engineer shall immediately notify the right-of-way user. If the right-of-way user does not commence the emergency repair within twenty-four (24) hours, the city may, at its sole discretion, cause performance of such emergency repair work as is necessary to correct the hazardous situation. The right-of-way user shall reimburse the city for the actual direct and indirect cost of the work necessary to correct the hazardous situation. The right-of-way user shall maintain the emergency repair for the work area of their emergency activity as directed by the city engineer until the right-of-way user completes construction and final repairs. (5) Barricades, signage, and other traffic control devices shall be removed from the work area, following completion of the work, in a timely manner. (6) Settling of backfill. a. The city shall notify the permittee in writing if the backfill on a permitted pavement cut or excavation settles or shows any other signs of damage not attributable to the reasonable usage and expected wear of the work area at any time during the two-year maintenance period, including the area within three foot feet beyond the utility patch in any horizontal direction. Upon notification, the permittee shall commence repair work within ten (10) days and notify the city a minimum of forty-eight (48) hours in advance of commencement of the repair work. If the repair work is not commenced within ten (10) days, the repair work may be performed by the city at the right-of-way user's expense. b. The city shall notify the permittee in writing if the backfill on a permitted pavement cut or excavation settles at any time during the two-year maintenance period. Upon notification, the permittee shall commence repair work within ten (10) days and notify the city forty-eight (48) hours in advance of commencement of the repair work. If the repair work is not commenced within ten (10) days, the repair work may be performed by the city at the right-of-way user's expense. c. Failure to repair or restore: Upon failure of the permittee to perform any such repair or restoration work described in this division, the city may repair such portion of the right-of-way as may be required. The permittee or right-of-way user shall reimburse the city for the actual direct and indirect costs of the repair work.

(Ord. No. 2019-2439, § I, 11-19-19)