§ 14.12.385 — Industrial and commercial stormwater requirements
Riverside Municipal Code (Supp. No. 33: codified through Ordinance No. 7776, enacted June 23, 2026) · Riverside Municipal Code § 14.12.385
Corpus is an independent public-information project, not the official City of Riverside website. Stable reference: corpuslaw.us/code/25775465-42c9-41a2-83a1-2952bc7be94d
14.12.385 - Industrial and commercial stormwater requirements.
A. Any person or entity that owns or operates a commercial and/or industrial facility(s) shall comply with the provisions of this ordinance. All such facilities shall be subject to a regular program of inspection as required by this ordinance, California Water Code §§13000 et seq. (Porter-Cologne Water Quality Control Act), Title 33 U.S.C. §§1251 et seq. (Clean Water Act), any applicable state or federal regulations promulgated thereto, and any related administrative orders or permits issued in connection therewith. B. NPDES permit for industrial/commercial activity. Any industrial discharger, discharger associated with construction activity, or other discharger subject to any NPDES permit issued by the United States Environmental Protection Agency, the State Water Resources Control Board, or the Santa Ana Regional Water Quality Control Board, shall comply with all requirements of such permit. Such dischargers shall specifically comply with the following permits: the Stormwater Industrial General Permit, the Construction Activity Storm water General Permit, and the Dewatering De Minimis General Permit. Proof of compliance with said NPDES General Permits may be required in a form acceptable to the Director prior to issuance of any building, or occupancy permits. C. Industrial facility storm water discharges are regulated pursuant to CWA section 402(p)(3)(A). The State Water Board issued a statewide general permit for industrial storm water discharges, excluding construction activities, called the National Pollutant Discharge Elimination System General Permit for Storm Water Discharges Associated with Industrial Activities, NPDES No. CAS000001 ("Industrial General Permit") with requirements for industrial sites. Industrial sites must evaluate if they need to obtain coverage under this Industrial General Permit. D. Industrial facilities must evaluate if they meet the criteria to obtain coverage under the Industrial General Permit and obtain coverage no later than within a week of opening for business. E. Industrial facilities must develop and implement Stormwater Pollution Prevention Plans (SWPPP) that include BMPs that will achieve compliance with state and local requirements. All industrial and commercial facilities must implement and maintain minimum BMPs, and any other BMPs requested by the Director during a storm water and/or pretreatment inspection to help protect the MS4 and sanitary sewer system. F. Industrial and commercial facilities must prevent their storm water or irrigation water from running off their property and onto another property and causing a nuisance, hazard, or conveying pollutants. G. All industrial and commercial facilities must prevent the potential discharge of pollutants in runoff from areas of material storage, vehicle or equipment fueling, vehicle or equipment maintenance (including washing), waste handling, hazardous materials handling or storage, delivery areas or loading docks, or other outdoor work areas. H. In the event of a spill, any person responsible for a facility, operation, activity, or emergency response for a facility, must immediately take mitigative action to control the release and shall immediately notify the City Public Works Department and Fire Department upon occurrence of an accidental discharge of prohibited materials or wastes. The City shall be notified by telephone at (951) 826-5311. The notification shall include the date, time, and location of the discharge, if it entered a storm drain or waterway, type of waste, including concentration and volume, and corrective actions taken. This notification does not relieve the user from any other reporting requirements of any other laws. Within five calendar days following a spill or discharge, the discharger shall submit a detailed written report to the Director including: 1. A description and cause of the event; 2. The location, type, concentration, and volume of the spill or discharge; 3. A determination of whether the spill or discharge entered a storm drain or waterway; 4. The duration of the event including exact dates and time of noncompliance, and if noncompliance continues, the time by which compliance is reasonably expected to be achieved; 5. The description of the remediation or cleanup methods and disposal, and submittal of copies of any disposal receipts and manifests; 6. All steps taken or to be taken to reduce, eliminate, and prevent recurrence of such accidental, negligent, or intentional spill or other conditions of noncompliance; and 7. Whether the California Emergency Management Agency (CALEMA) had been notified by phone at (800) 852-7550. I. Surface cleaning including mopping, rinsing, washing, pressure washing, steam cleaning, and floor mat washing shall only be performed with appropriate BMPs with no discharge of any liquid, material, or waste to the MS4. J. The exterior of waste oil, grease, tallow, and other restaurant or food service containers and the surfaces surrounding such containers shall, at all times, be kept clean of residual oil, grease, and other substances. K. Trash, recyclable, and waste disposal container covers shall be closed. L. Equipment, parts, and materials stored outside which have potential contribute to storm water pollution shall be covered or stored in a manner in which contact with precipitation, directly or from runoff is prevented. M. Machinery and equipment, including motor vehicles, which are leaking significant amounts of oil or fluid must be repaired, and the leaking oil must be cleaned up appropriately. N. Poorly managed authorized non-storm water discharges or evidence of unauthorized non-storm water discharges, which may be illicit connections or illegal discharges to the MS4, and other violations of this chapter may result in an enforcement action against the facility and/or property owner. O. All industrial and commercial facilities must comply with all the requirements contained within this chapter and must correct deficiencies noted during inspections or on any enforcement or compliance documents. P. Stormwater may enter the sewer collection system with Director approval, and in accordance with the following: 1. Users having outdoor areas which allow wastewater and storm water to enter the sanitary collection system, or for which the initial diversion of contaminated storm water would assist in the preservation of surface or subsurface water quality, may be required to install and maintain, at the user's expense, a storm water diversion system to mitigate the release of rainwater to the sanitary sewer during a storm event. 2. The storm water diversion system design and use shall be reviewed and approved by the Director prior to installation, and must comply with rainwater diversion system design requirements. 3. The system shall be designed to allow wastewater to enter the collection system during dry weather and divert excess storm water after the first 0.1 inches of rainfall back to the MS4 during storm events. 4. During storm events, the user shall immediately suspend all outdoor wastewater generating activities and divert all storm water to a storm drain or impound contaminated water for release to the sanitary sewer after the cessation of rainfall. 5. If the segregation of industrial wastewater and stormwater is infeasible, or if discharge of contaminated storm water would create a pollution threat to surface or subsurface waters, the user may make application to the Director requesting that the storm water be considered an industrial wastewater and approved for discharge to the POTW. Approval of a storm water discharge to the POTW shall be based on: a. Hydraulic capacity of the collection system; b. Hydraulic capacity of the treatment plant; c. A demonstrated need to discharge storm water to the POTW to prevent surface and subsurface water contamination d. Dry weather urban runoff diversions must also comply with the City's guidelines on dry weather diversion BMPs. Q. All users must comply with this Chapter and must comply with the State Water Resources Control Board's storm water requirements. The Director may require storm water protection BMPs (such as covers over hazardous waste and chemical storage areas, cleaning of exposed areas prior to an expected rain event, etc.) to mitigate the potential release of pollutants to the storm drain, and cannot have equipment outside if it causes pollutants to have potential to enter storm water.
(Ord. 7551 §30, 2021; Ord. 7362 §6, 2017; Ord. 7032 §2, 2009; Ord. 6377 §2 (part), 2002; Ord. 6232 §2 (part), 1995)
Ask a question about Riverside law
Corpus searches the Riverside sections it holds and shows the ones that match, with their citations. Free, no sign-in.
