For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 25-89 — General rights-of-way use and construction

Code of Ordinances, City of Denton, Texas (Supp. No. 37, Update 1: codified through Ordinance No. 26-296 adopted March 24, 2026) · Denton City Code § 25-89

Corpus is an independent public-information project, not the official City of Denton website. Stable reference: corpuslaw.us/code/26404521-c7d2-4c16-a4c1-1302ae2c393b

Sec. 25-89. - General rights-of-way use and construction.

(a) Responsibility for employees, courtesy and drug policy. Right-of-way users shall be responsible and liable for the acts and omissions of their employees, temporary employees, officers, directors, consultants, agents, affiliates, subsidiaries, and subcontractors in connection with the installations of facilities in the right-of-way, as if such acts or omissions were right-of-way users acts or omissions. Work in the rights-of-way shall be done in a manner that causes the least interference with the rights and reasonable convenience of property owners and residents. Citizen satisfaction must be a priority in using the rights-of-way. Right-of-way users shall train their employees to be customer service-oriented and to positively and politely interact with citizens when dealing with issues pertaining to its facilities in the right-of-way. Employees shall be clean, courteous, efficient, and neat in appearance and committed to offering the highest quality of interaction with the public. If, in the opinion of the city manager, the employee is not interacting in a positive and polite manner with citizens, he or she shall request that the right-of-way user take all remedial steps to conform to these standards. It is the policy of the city to achieve a drug-free workforce and workplace. The manufacture, distribution, dispensation, possession, sale, or use of illegal drugs or alcohol by right-of-way users employees, contractors, subcontractors, or vendors while on rights-of-way is strictly prohibited. (b) Minimal interference. Right-of-way user's facilities shall be constructed or maintained in such a manner as not to interfere with sewers, water pipes, or any other property of the city, or with any other pipes, wires, conduits, pedestals, structures, or other facilities that may have been laid in the rights-of-way by, or under, the city's authority. The right-of-way user's facilities shall be located, erected, and maintained so as not to endanger or interfere with the lives of persons, or to interfere with improvements the city may deem proper to make, or to unnecessarily hinder or obstruct the free use of the rights-of-way or other public property or unjustly interfere with the travel and use of public places by the public during the construction, repair, operation, or removal thereof, and shall endeavor to not obstruct or impede traffic. The right-of-way user shall not cause any interference with city's public safety radio system, traffic signal light system, or other safety communications components. (c) Responsibilities under permit; location of facilities. (1) A permit does not relieve a right-of-way user of the responsibility to coordinate with other utilities and property owners, and to protect existing facilities. A right-of-way user working in the right-of-way is responsible for obtaining line locates from all affected utilities or others with facilities in the right-of-way prior to any excavation. Use of a remote records system such as geographic information systems or the plans of record does not satisfy this requirement. (2) In performing location of facilities in the rights-of-way in preparation for construction under a permit, a right-of-way user shall compile all information obtained regarding its or any other facilities in the rights-of-way related to a particular permit and shall make that information available to the city in a written and verified format acceptable to the city engineer. a. Protection of utilities. Before beginning excavation in any right-of-way, a right-of-way user shall contact the Texas One-Call System or any other company operating under the One-Call Statute and, to the extent required by V.T.C.A. Utilities Code Ch. 251, make inquiries of all ditch companies, utility companies, districts, local government departments, and all other agencies that might have facilities in the work area to determine possible conflicts. Field locations shall be marked prior to commencing work. The right-of-way user shall support and protect all pipes, conduits, poles, wires, or other apparatus that may be affected by the work from damage during construction or settlement of trenches after construction. b. A person shall only use a water-based paint in the right-of-way to mark the location of existing underground utilities. (d) Underground construction; use by city. Should the city desire to place its own facilities in trenches or bores opened by the right-of-way user, the right-of-way user shall cooperate with the city in any construction by the right-of-way user that involves trenching or boring, provided that the city has first notified the right-of-way user in some manner that it is interested in sharing the trenches or bores in the area in which the right-of-way user's construction is occurring. The right-of-way user shall allow the city to place its facilities in the right-of-way user's trenches and bores, provided the city incurs any incremental increase in cost of the trenching and boring. The city shall be responsible for maintaining its respective facilities buried in the right-of-way user's trenches and bores under this paragraph. (e) Joint trenching. The rights-of-way have a limited capacity for containing facilities. The city engineer may require a right-of-way user to share trench space to minimize the disruption of vehicular or pedestrian traffic. (1) All facilities shall meet any applicable local, state, and federal clearance and other safety requirements, be adequately grounded and anchored, and meet the provisions of any contracts executed between right-of-way user and the other joint user. Right-of-way user, as owner of the structure for collocation, may, at its option, correct any attachment deficiencies and charge the joint user for its costs. (2) Joint trenching with the city's electric utility shall adhere to its guidelines for gas, communications and electric trench requirements. (f) Excavation safety. The excavation safety plan shall be designed in conformance with federal and/or state law and Federal Occupational Safety and Health Administration standards and regulations. (g) Erosion control. The right-of-way user shall be responsible for storm water management erosion control that complies with city, state and federal guidelines. The SWPPP shall be in accordance with city's standard construction specification documents. (h) Electrical supply. Right-of-way users are responsible for obtaining any required electrical power services to their facilities. The city shall not be liable for any stoppages or shortages of electrical power furnished to the facilities, including without limitation, stoppages or shortages caused by any act, omission, or requirement of the public utility serving the facilities or the act or omission of any other tenant of the structure or user of the right-of-way, or for any other cause beyond the control of the city. Fixed generators and back-up generators are prohibited in the right-of-way.

(Ord. No. 2019-2439, § I, 11-19-19)

Ask a question about Denton law

Corpus searches the Denton sections it holds and shows the ones that match, with their citations. Free, no sign-in.