Sec. 9-188. - General standards both for construction and post-construction.
In all areas of the city, except areas designated as VE on the FIRM map, the following standards shall apply to all construction within the City of Pasadena: (1) All new construction or substantial improvements shall be designed (or modified) and adequately anchored to prevent flotation, collapse or lateral movement of the structure resulting from hydrodynamic and hydrostatic loads, including the effects of buoyancy; (2) All new construction and substantial improvements shall be constructed by methods and practices that minimize flood damage; (3) All new construction or substantial improvements shall be constructed with materials and utility equipment resistant to flood damage; (4) All new construction or substantial improvements shall be constructed with electrical, heating, ventilation, plumbing, and air conditioning equipment and other service facilities that are designed and/or located so as to prevent water from entering or accumulating within the components during conditions of flooding, meeting the same requirements as FF to BFE; (5) All new and replacement water supply systems shall be designed to minimize or eliminate infiltration of floodwaters into the system; (6) New and replacement sanitary sewage systems shall be designed to minimize or eliminate infiltration of floodwaters into the system and discharges from the systems into floodwaters; (7) On-site waste disposal systems shall be located to avoid impairment to them or contamination from them during flooding; (8) There shall be no new development within the 100-year (one (1) percent) flood hazard zone in the Armand Bayou Watershed south of the tidal influenced flow; (9) A building under construction and finished construction elevation certificate (Standard FEMA form) signed and sealed by a professional engineer or land surveyor is required for each and every building within the City of Pasadena, regardless of its location with respect to the flood hazard boundary. A construction drawing elevation certificate may be required. All elevation certificates shall include in the comments section, the benchmark used with description of the location and centerline elevations of all adjacent streets; (10) There shall be no adverse flooding impact on any property from any fill placed in the same or nearby watershed; and (11) Final pollution control measures and stabilization or post-construction. These measures shall stabilize construction sites where either of the following conditions are met: a. All soil disturbing activities at the site have been completed and a uniform (e.g., evenly distributed, without large bare areas) perennial vegetative cover with a density of seventy (70) percent of the native background vegetative cover for the area has been established on all unpaved areas and areas not covered by permanent structures, or equivalent permanent stabilization measures (such as the use of riprap, gabions, or geotextiles) have been employed. b. For individual lots in a residential construction site by either: i. The homebuilder completing final stabilization as specified in condition (11)a. above; or ii. The homebuilder of single-family homes establishing final stabilization for an individual lot by sodding the front yard with a vegetative cover with a minimum of seventy (70) percent density (no bare spots) and installing a perimeter of sod for the remaining portions of the yard to prevent soil erosion. c. For construction activities on land used for agricultural purposes (e.g. pipelines across crop or range land), final stabilization may be accomplished by returning the disturbed land to its pre-construction agricultural use. Areas disturbed that were not previously used for agricultural activities, such as buffer strips immediately adjacent to surface water and areas which are not being returned to their pre-construction agricultural use must meet the final stabilization conditions of condition (a) above. d. Acceptance of improvement by the city may occur before the final stabilization coverage requirement is met, if the developer agrees to maintain the stabilization until coverage is achieved and all other permanent measures are complete. e. Once final stabilization has been achieved, the responsible party shall notify the director of engineering, building official, or designated representative that final stabilization has been achieved. f. Erosion control structures must be provided where necessary to control erosive velocities in unlined channels or swales leaving the site. g. Sediment traps must be provided on the site, as necessary, to control sedimentation from concentrated storm water discharges into an environmentally sensitive area. Individual assessments must be made on a site-specific basis. However, a rock rubble low berm must be installed around an outfall that discharges directly into an environmentally sensitive area, unless this requirement is waived by the director of engineering because the responsible party has installed another type of sediment trap that provides equal or better protection.
(Ord. No. 20-186, § 1(Exh. 1), 1-5-21)
Ask a question about Pasadena law
Corpus searches the Pasadena sections it holds and shows the ones that match, with their citations. Free, no sign-in.