For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 10.36.090 — Breaking Pavement

Spokane Municipal Code; partial · SMC 10.36.090 · Effective

Corpus is an independent public-information project, not the official City of Spokane website. Stable reference: corpuslaw.us/code/31fda6a2-1067-481f-9f29-b47e316f18c3

Section 10.36.090 Breaking Pavement

Whenever installation of gas facilities requires excavation of existing pavement, the excavator must: A. score or otherwise cut asphalt pavement in a straight line and, using a concrete saw, cut a sufficient kerf to allow complete breakage of the pavement and base without ragged edges; B. make pavement cuts as vertical as possible; C. entirely remove the pavement to expose at least six-inch shoulders of undisturbed subgrade material, unless otherwise directed by the director of engineering services.

Date Passed: Monday, June 4, 2007 Effective Date: Wednesday, July 11, 2007 ORD C34041 Section 1 (Recodification)

Ask a question about Spokane law

Corpus searches the Spokane sections it holds and shows the ones that match, with their citations. Free, no sign-in.