Water facilities.
Saint Paul Legislative Code § 69.505
in effectSec. 69.505. - Water facilities.
(a) General requirements:
(1) The applicant shall install water main facilities in a manner prescribed by the water utility. All plans shall be designed in accordance with the rules, regulations and standards of the water utility, health department and other appropriate agencies. Plans shall be approved by the above agencies.
(2) Where public water mains are not available for extension, action shall be taken by the applicant to create a water supply district for the purpose of providing a water supply system capable of providing domestic water use and fire protection.
(3) Looped water mains shall be required unless specifically varied by the water utility and fire department.
(b) Locations with water mains available. Water mains facilities shall connect with the public water main facilities. Water mains shall be installed to serve each lot and to grades and sizes required by approving officials and agencies. To eliminate future street openings, all underground water facilities shall be installed before any final paving of a street shown on the subdivision plat. Fire hydrants shall be located at each intersection and no more than six hundred (600) feet apart and shall be approved by the applicable protection unit. Water main facilities shall be subject to the specifications, rules, regulations and guidelines of the water utility.
(c) Locations with no available water mains:
(1) Action shall be taken by the applicant to create a water supply district for the purpose of providing a water supply system capable of providing domestic water use and fire protection.
(2) In single-family zoning districts, if the planning commission determines that a public water main is not available, individual wells may be used or a central water system provided in such a manner that an adequate supply of potable water will be available to every lot in the subdivision. Water samples shall be submitted to the health department for its approval, and individual wells and central water systems shall be approved by the appropriate health authorities. Orders of approval shall be submitted to the planning commission.
(3) If the planning commission requires that a connection to a public water main eventually be provided as a condition to approval of an individual well or central water system, the applicant shall make arrangements for future water service at the time the plat receives final approval. Performance or cash bonds may be required to insure compliance.
(d) Mandatory connection to public water mains. Except in the R-LL District, if a public water main is placed in a street abutting upon developed property, the owner thereof shall be required to connect the development to the public water main within three (3) years.
(e) Provision of water facilities in the R-LL District. In the R-LL District, existing individual wells or central water systems shall be permitted to continue, in accordance with applicable city, county and state requirements. New individual wells or central water systems shall be permitted, in accordance with applicable city, county and state requirements, except if a public water main is in place. If a public water main is in place prior to development, new development shall connect to it. If a public water main is placed in a street abutting upon developed property with an existing individual well or central water system, the owner shall not be required to connect to the public water main.
(Ord. No. 17890, § 4, 11-21-91; C.F. No. 03-1028, § 1, 4-7-04)
Source: City of Saint Paul, Minnesota, City Charter, Legislative Code and Administrative Code (Municode Library, library.municode.com)URL: https://library.municode.com/mn/st._paul/codes/code_of_ordinances?nodeId=PTIILECO_TITVIIIZOCO_CH69ZOCOUBRE_ARTVGEREDEST_S69.505WAFAFetched: 11/1/2026
