For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 49-55.3 — INSPECTION AND SAMPLING

Dallas City Code (7/2026 Code (S-33): Vols. I-II current through Ordinance 33447, passed June 10, 2026; Vol. III through Ordinance 33484, passed June 24, 2026) · Dallas City Code § 49-55.3

Corpus is an independent public-information project, not the official City of Dallas website. Stable reference: corpuslaw.us/code/362ce233-d194-43e8-80d9-10ca3b132463

SEC. 49-55.3. INSPECTION AND SAMPLING.

(a) Inspection and sampling. The director shall inspect and sample each significant industrial user at least once each year. The director may, however, inspect and sample a significant industrial user more frequently. The inspection, surveillance, and monitoring must be independent of information received from the self-monitoring reports program. If a significant industrial user requires additional samples, the director may require the user to pay the cost of the additional service. (b) Sample collection and analysis. Samples must be collected and analyzed in accordance with Sections 49-51 (j) and (k). Self- monitoring, sampling, reporting, notification and recordkeeping requirements, including an identification of the pollutants to be monitored, sampling location, sampling frequency, and sample type, must be based on the applicable general pretreatment standards in Title 40, Code of Federal Regulations, Chapter 403, as amended, categorical pretreatment standards, local limits, and state and local law. A sample may be taken manually or by use of mechanical equipment. (c) Submission of monitoring data. All significant industrial users shall submit all monitoring data of regulated pollutants that has been collected at the appropriate sampling location, in accordance with Section 49-51 . Self-monitoring, sampling, reporting, notification, and recordkeeping requirements, including an identification of the pollutants to be monitored, sampling location, sampling frequency, and sample type, must be based on the applicable general pretreatment standards in Title 40, Code of Federal Regulations, Chapter 403, as amended, categorical pretreatment standards, local limits, and state and local law. (d) Accidental discharge/slug control plans. Within one year after an industrial user is designated as a significant industrial user, the director shall evaluate and determine whether the significant industrial user needs to develop, submit, and implement an accidental discharge/slug control plan. The director may also require any industrial user to develop, submit, and implement such a plan. Alternatively, the director may develop the plan for any industrial user. An accidental discharge/slug control plan must address, at a minimum, the following: (1) A description of discharge practices, including non-routine batch discharges. (2) A description of stored chemicals. (3) Procedures for immediately notifying the director of any accidental or slug discharge, as required by Section 49-51(i). (4) Procedures to prevent adverse impact from any accidental or slug discharge. The procedures may include, but are not limited to, the inspection and maintenance of storage areas, the handling and transfer of materials, the loading and unloading operations, the control of plant site runoff, worker training, the building of containment structures or equipment, measures for containing toxic organic pollutants (including solvents), and measures and equipment needed in the event of emergency response. The results of the activities described in Paragraphs (1) through (4) of this subsection must be available to the approval authority upon request. (e) Self-monitoring program. The director may, to the extent permitted by the EPA, delegate self- monitoring and reporting responsibilities to specific industrial waste discharge permittees, based upon the compliance history of a permittee and the volume and character of the waste discharge. Self-monitoring data from an industrial user must be submitted with accompanied chain-of-custody forms. (f) Waiver of pollutant sampling. (1) The city may authorize an industrial user subject to a categorical pretreatment standard to forego sampling of a pollutant regulated by a categorical pretreatment standard if the industrial user has demonstrated, through sampling and other technical factors, that the pollutant is neither present nor expected to be present in the discharge, or, if present, is only present at background levels from intake water, without any increase in the pollutant due to activities of the industrial user. (2) The authorization is subject to the following conditions: (A) The pollutant is determined to be present solely due to sanitary wastewater discharged from the facility, provided that the sanitary wastewater: (i) is not regulated by an applicable categorical standard; and (ii) includes no process wastewater. (B) The waiver is valid only for the duration of the effective period of the individual wastewater discharge permit, but in no case longer than five years. The industrial user must submit a new request for a waiver when a subsequent individual wastewater discharge permit is granted. (C) The industrial user must provide data from at least one sampling of the facility’s process wastewater prior to any treatment present at the facility. The process wastewater sample must be representative of wastewater from all processes. (D) The request for a waiver must be signed in accordance with Section 49-1(5) and include the following certification statement: “Based on my inquiry of the person or persons directly responsible for managing compliance with the pretreatment standard for 40 CFR ________ [specify applicable national pretreatment standard part(s)], I certify that, to the best of my knowledge and belief, there has been no increase in the level of ________ [list pollutant(s)] in the wastewaters due to the activities at the facility since filing of the last periodic report.” (E) Non-detectable sample results may be used as a demonstration that a pollutant is not present if the EPA-approved method from Title 40, Code of Federal Regulations, Part 136, as amended, with the lowest minimum detection level for that pollutant was used in the analysis. (F) Any waiver by the director must be included as a condition in the industrial user’s permit, including the requirement of Section 49-51(k)(3). The reasons supporting the waiver and any information submitted by the industrial user in its request for the waiver must be maintained by the director for a period of three years after the expiration of the waiver. (G) The industrial user must certify that there has been no increase of the pollutant in its wastestream due to its activities. The certification must appear on all future reports, along with the statement in Section 49-51(m). (H) In the event that a waived pollutant is found to be present or is expected to be present based on changes occurring in the industrial user’s operations, the industrial user must immediately: (i) comply with the sampling requirements of Section 49-51(d) or other more frequent sampling requirements imposed by the director; and (ii) notify the director. (3) This subsection does not supersede certification processes and requirements established in categorical pretreatment standards, except as otherwise provided in the categorical pretreatment standards. (Ord. Nos. 19201; 20215; 21409; 26925; 28084; 31480)

Ask a question about Dallas law

Corpus searches the Dallas sections it holds and shows the ones that match, with their citations. Free, no sign-in.