Failure to submit.
San José Municipal Code § 27.28.210
in effect27.28.210 - Failure to submit.
A Contractor is not entitled to additional compensation or an extension of time based on any Claim for which the Contractor does not submit a Notice of Potential Claim in accordance with the requirements in the Public Works Contract.
(Ord. 30540.)
Source: City of San José, Municipal Code (Municode Library, library.municode.com)URL: https://library.municode.com/ca/san_jose/codes/code_of_ordinances?nodeId=TIT27PRPUWO_CH27.28DIRE_PT4NOPOCL_27.28.210FASUFetched: 11/1/2026
