For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 18-29-1003.3.8.1 — Location and construction

Municipal Code of Chicago (2026 S-74, current through Council Journal of June 17, 2026) · Municipal Code of Chicago § 18-29-1003.3.8.1

Corpus is an independent public-information project, not the official City of Chicago website. Stable reference: corpuslaw.us/code/411dabcc-caa1-4691-9060-42123f5d8181

18-29-1003.3.8.1 Location and construction.

A grease catch basin shall be located outside a building and shall be constructed of heavy cast iron or equally durable metal, fiberglass or high-density polyethylene, concrete (precast or monolithic) or brick or concrete block construction with the block or brick laid up in portland cement mortar with walls not less than 5 inches (125 mm) thick, and bottom not less than 2 inches (50 mm) thick. The basin shall be watertight. The basin shall be not less than 36 inches (914 mm) in diameter below the top of the highest inlet pipe. The bottom of the basin shall be not less than 36 inches (914 mm) below the invert of the outlet pipe. The outlet pipe shall be trapped with a catch basin trap and made of a material as required by this chapter. The catch basin trap shall have a minimum seal of 4 inches (100 mm) and shall have an accessible cleanout of a minimum of 3 inches (75 mm). (Amend Coun. J. 10-14-21, p. 37722, Art. X, § 3)

Ask a question about Chicago law

Corpus searches the Chicago sections it holds and shows the ones that match, with their citations. Free, no sign-in.