Construction Provisions.
Boulder Revised Code 1981 § 11-6-5
in effect11-6-5. - Construction Provisions.
(a) System Construction Schedule: Every franchise agreement shall specify the construction schedule that will apply to any required construction, upgrade or rebuild of the cable system. The schedule shall provide for prompt completion of the project, considering the amount and type of construction required.
(b) Construction Procedures:
(1) A franchisee shall construct, operate and maintain a cable system subject to the supervision of all of the authorities of the city who have jurisdiction in such matters and in strict compliance with all laws, ordinances, rules and regulations affecting the cable system.
(2) The cable system shall be subject to the right of periodic inspection by the city. Inspections will be conducted in a manner so as not to unreasonably interfere with the operations of a cable system or the provision of service to subscribers. The city will bear its own costs associated with any independent technical tests of the cable system.
(3) No construction, reconstruction or relocation of the cable system within the public rights-of-way shall be commenced until written permits have been obtained from the proper city officials. In any permit so issued, such officials may impose such fees, conditions and regulations as a condition of the granting of the permit as are imposed on similar uses of the right-of-way.
(c) Construction Standards:
(1) The construction, operation, maintenance or repair of a cable system shall be in accordance with all applicable laws, including, without limitation, zoning laws, construction codes and the City of Boulder Design and Construction Standards, as amended. A franchisee shall at all times employ reasonable care, within the meaning of applicable law, and shall install and maintain in use commonly accepted methods and devices preventing failures and accidents that are likely to cause damage, injury or nuisance to the public.
(2) Without limiting the foregoing, all of a franchisee's cable system shall be constructed, operated and maintained in accordance with good engineering practices, performed by experienced and properly trained maintenance and construction personnel.
(3) Except in underground service areas, all parts of the cable system, including electronics, vaults, trunk, feeder and drop cable may be constructed overhead where poles now exist and electric and telephone lines are now overhead, but where either electric or telephone lines are underground, all trunk, feeder and drop cable shall be constructed underground. Whenever and wherever the poles on which a franchisee's poles are attached are no longer in use for electrical or telephone plant, all cable system facilities and plant attached to such poles shall be moved underground by the franchisee.
(4) All safety practices required by law shall be used during construction, maintenance and repair of a cable system. A franchisee shall at all times employ reasonable care and shall install and maintain in use commonly accepted methods and devices preventing failures and accidents that are likely to cause damage, injury or nuisance to the public.
(5) A franchisee shall not place facilities, equipment or fixtures where they will interfere with any gas, electric, telephone, telecommunications, water, sewer or other utility facilities, or obstruct or hinder in any manner such entities' use of any public rights-of-way, and no future occupant of the right-of-way shall interfere with the use of the right-of-way by a franchisee.
(6) Any and all public rights-of-way, public property or private property that is disturbed or damaged during the construction, repair, replacement, relocation, operation, maintenance or construction of a cable system shall be promptly repaired by the franchisee.
(7) A franchisee shall, by a time specified by the city, protect, support, temporarily disconnect, relocate or remove any of its property when required by the city or any other governmental entity by reason of traffic conditions; public safety; public right-of-way construction; public right-of-way maintenance or repair (including resurfacing or widening); change of public right-of-way grade; construction, installation or repair of sewers, drains, water pipes, power lines, signal lines, tracks or any other type of government-owned communications system, public work or improvement or any government-owned utility; public right-of-way vacation; undergrounding of adjacent electric or telephone line so that adjacent poles are no longer in use for electrical or telephone plant; or for any other purpose where the convenience of the city or such entity would be served thereby; provided, however, that:
(A) Except in the case of emergencies, the city shall provide written notice describing where the work is to be performed at least one week prior to the deadline for performing the work; a franchisee may seek an extension of the time to perform the work where it cannot be performed in a week even with the exercise of due diligence, and such request for an extension shall not be unreasonably refused; and
(B) A franchisee may abandon any property in place upon notice to the city, unless the city determines, in the exercise of its reasonable discretion exercised within sixty days of the date the city receives notice, that the safety, appearance, functioning or use of the public rights-of-way and facilities in the public rights-of-way will be adversely affected thereby.
(8) If any removal, relaying or relocation is required to accommodate the construction, operation or repair of the facilities of another person (other than the city) that is authorized to use the public rights-of-way, a franchisee shall, after thirty days' advance written notice, take action to effect the necessary changes requested by the responsible entity. Unless the matter is governed by a valid contract or a state or federal law or regulation, the reasonable cost of removal, relaying or relocation shall be borne by the party requesting the removal, relaying or relocation. The city may direct a franchisee to remove, relay or relocate its facilities pending resolution of a dispute as to responsibility for costs, if the person requesting removal, relaying or relocation posts security satisfactory to the city.
(9) In the event of an emergency, or where a cable system creates or is contributing to an imminent danger to health, safety or property, while the officers of the city will make reasonable efforts to contact the franchisee, the city may remove, relay or relocate any or all parts of that cable system without prior notice.
(10) A franchisee shall, on the request of any person holding a valid permit issued by a governmental authority, temporarily raise or lower its wires to permit the moving of buildings or other structures. The expense of such temporary removal or raising or lowering of wires shall be paid by the person requesting same, and the franchisee shall have the authority to require such payment in advance. The franchisee shall be given not less than fourteen days' advance notice to arrange for such temporary wire changes.
(11) Subject to obtaining advance permission from the city manager, which shall not be unreasonably refused, a franchisee shall have the authority to trim trees that overhang a public right-of-way of the city so as to prevent the branches of such trees from coming in contact with the wires of the franchisee. At the option of the city, such trimming may be done by it or by the franchisee, but in either case, at the expense of the franchisee.
(12) Prior to erection of any towers, poles or conduits or the construction, upgrade or rebuild of a cable system authorized under this chapter, a franchisee shall first submit to the city and other designated parties for approval a concise description of the cable system proposed to be erected or installed, including engineering drawings, if required by the city, together with a map and plans indicating the proposed location of all such facilities. No erection or installation of any tower, pole, underground conduit or fixture or any rebuilding or upgrading of a cable system shall be commenced by any person until approval therefor has been received from the city in accordance with standard permitting practices of the city. A franchisee is expected to use, with the owner's permission, existing underground conduits or overhead utility facilities whenever feasible.
(13) Any contractor or subcontractor used for work or construction, installation, operation, maintenance or repair of cable system equipment must be properly licensed, and each contractor or subcontractor shall have the same obligations with respect to its work as franchisee would have under this chapter and applicable law if the work were performed by the franchisee. The franchisee must ensure that contractors, subcontractors and all employees who will perform work for it are trained and experienced. The franchisee shall be responsible for ensuring that the work of contractors and subcontractors is performed consistent with its franchise agreement and applicable law, shall be fully responsible for all acts or omissions of contractors or subcontractors, shall be responsible for promptly correcting acts or omissions by any contractor or subcontractor, and shall implement a quality control program to ensure that the work is properly performed. This subsection shall not be deemed to alter a franchisee's tort liability to third parties.
(d) Participation With Other Utilities and the City: A franchisee shall cooperate in the planning, locating and construction of its cable system in utility joint trenches or common duct banks with other telecommunications providers and the city. The city will provide advance notice to any franchisee when it plans to open a trench and each franchisee shall provide notice to the city when it plans to open a trench. The franchisee and the city will offer to make space available to the other, and to other persons who are subject to the same obligations, on reasonable terms, consistent with applicable law and this chapter.
(e) Underground Services Alert: Each franchisee shall be a member of the regional notification center for subsurface installations (underground services alert) and shall field mark, at its sole cost and expense, the locations of its underground cable system facilities upon notification by the city.
(f) Provision of Service/Quality of Service: In addition to satisfying such requirements as may be established through the application process, every cable system shall be subject to the following conditions, except as prohibited by federal law or where other standards are specified in a franchise agreement:
(1) After cable service has been established by activating trunk distribution cable for an area specified in a franchise agreement, a franchisee shall provide cable service to any household or commercial establishment requesting cable service in accordance with the franchise agreement within that area, including each attached dwelling unit in that area, except for attached dwelling units to which it cannot legally obtain access. Service must be provided within time limits specified in paragraph 11-6-5(f)(2), B.R.C. 1981.
(2) A franchisee must extend service to any person who requests it within ten days of the request, where service can be provided by activating or installing a drop, within ninety days where an extension of one-half a mile or less is required, and within six months when an extension of more than one-half mile is required, provided that, in cases where a franchise agreement permits a franchisee to require a potential subscriber to bear a share of extension or installation costs, and franchisee requires the potential subscriber to bear such costs, the time for extension shall be measured from the date on which the subscriber agrees to bear such costs or, if a franchisee requires prepayment of all or a portion of the estimated costs, from the date on which the prepayment is made. A franchisee that requires a potential subscriber to bear a portion of installation or extension costs must prepare a written estimate of extension costs within seven days of a request for an installation or extension that would be subject to cost-sharing.
(3) Any cable system within the city shall meet or exceed the technical standards set forth in 47 C.F.R. § 76.601 and any other applicable technical standards. Enforcement of such technical standards shall be by the FCC unless the FCC allows enforcement by the city.
(4) A franchisee shall perform all tests reasonably necessary to demonstrate compliance with the requirements of the franchise agreement and other performance standards established by applicable law. Unless a franchise agreement or applicable law provides otherwise, all tests shall be conducted in accordance with federal rules and in accordance with the most recent edition of National Cable Television Association's Recommended Practices for Measurements on Cable Television Systems, or if no recent edition exists, such other appropriate manual as the city may designate. A written report of any test results shall be filed with the city within seven days of each test. If the location fails to meet performance specifications, within a reasonable time the franchisee, without requirement of additional notice or request from city, shall take corrective action, retest the locations and advise the city of the action taken and results achieved.
(5) The city may conduct inspections of a cable system including, without limitation, the headend, construction areas and subscriber installations to assess, among other things, franchisee's compliance with its franchise agreement and applicable law. If the franchisee is notified of any violations found during course of inspections, the franchisee must bring violations into compliance within thirty days of the date on which notice of violation is given, and must submit a report to the city describing the steps taken to bring itself into compliance or must file an appeal with the city manager during the same time period. All appeals shall be decided under chapter 1-3, "Quasi-Judicial Hearings," B.R.C. 1981. Inspection does not relieve the franchisee of its obligation to build a cable system in compliance with all provisions of its franchise agreement and applicable law.
(6) Any franchise serving any portion of the city must accept equivalent obligations for franchise fees and PEG use, capacity, facilities and financial support, on a gross revenue or per subscriber basis, as the case may be.
(7) If a franchise serves a television shadow area, it must construct at least an equivalent number of miles of cable distribution plant outside of the television shadow area as it constructs inside the television shadow area and must satisfy the other obligations imposed on any other franchise or permit, other than those relating to geographical coverage, and must accept equivalent obligations for franchise fees and PEG use, capacity, facilities and financial support, on a gross revenue or per subscriber basis, as the case may be.
(g) Publicizing Proposed Construction Work: A franchisee shall publicize any substantial rebuild of its cable system at least one week prior to commencement of that work by causing written notice of such construction work to be delivered to the city and by notifying those persons within three hundred feet of the work in at least two of the following ways: by telephone, in person, by mail, by distribution of flyers to residences, by publication in local newspapers or in any other manner reasonably calculated to provide adequate notice. In addition, before entering onto any person's property, a franchisee shall attempt to contact the property owner or (in the case of residential property) the resident at least one day in advance. If a franchisee must enter a residence or building, it must schedule an appointment at the convenience of the owner or resident.
(h) System Maintenance:
(1) A franchisee shall schedule maintenance so that activities likely to result in an interruption of service are performed during periods of minimum subscriber use of the cable system.
(2) Each franchise agreement shall provide that the franchisee will be obligated to follow maintenance practices that will ensure that its cable system is maintained in accordance with the highest industry standards.
(i) Continuity of Service: Each franchise agreement shall provide that subscribers are able to receive continuous service and that, in the event the franchise is revoked or terminated, the franchisee shall be obligated to continue to provide service for a reasonable period to assure an orderly transition of service from the franchisee to another entity.
Source: City of Boulder, Colorado, Revised Code and City Charter (Municode Library, library.municode.com)URL: https://library.municode.com/co/boulder/codes/municipal_code?nodeId=TIT11UTAI_CH6BOCACO_11-6-5COPRFetched: 11/14/2026