For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

Action for Dwelling Design, Construction, or Remodeling Claims.

AS tit. 09, ch. 09.45, art. Article 11
in effect

AS 09.45.881 Notice of claim.

AS 09.45.882 Written response to notice of claim.

AS 09.45.883 Court action allowed if claim disputed or not responded to.

AS 09.45.884 Consequence of rejecting inspection or settlement offer.

AS 09.45.885 Consequence of accepting inspection offer.

AS 09.45.886 Procedure after inspection.

AS 09.45.887 Court action allowed after failure to repair or to settle.

AS 09.45.888 Court action allowed if claimant rejects offer.

AS 09.45.889 Unreasonable rejection of offer.

AS 09.45.890 Acceptance of offer.

AS 09.45.891 Presumption of mitigation.

AS 09.45.892 Noncompliance assertion prohibited.

AS 09.45.893 Notice required in contract.

AS 09.45.894 Additional construction defects; additional notice of claim required.

AS 09.45.895 Limitation on damages; collateral sources.

AS 09.45.896 Exemption.

AS 09.45.899 Definitions.

Source: Alaska State Legislature (akleg.gov)URL: https://www.akleg.gov/basis/statutes.asp?media=print&secStart=09.45.001&secEnd=09.45.999#09.45Fetched: 10/20/2026