For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 18.70.060 — Section C402.6 Air Barrier Requirement, Added

El Paso City Code (Supp. No. 95, Update 4: codified through Ordinance No. 019889, enacted June 23, 2026) · El Paso City Code § 18.70.060

Corpus is an independent public-information project, not the official City of El Paso website. Stable reference: corpuslaw.us/code/51661469-76fc-44f5-b5b7-5ca872658b24

18.70.060 - Section C402.6 Air Barrier Requirement, Added.

C402.6 Air barrier requirement. Insulation (including but not limited to loose fill, spray applied cellular fiber insulation as well as other blanket and batts insulation) installed in assemblies more than 60 degrees from the horizontal must be in substantial contact with an air barrier on all sides. Exception: Air impermeable insulation. Air impermeable insulation is defined as: A material having an air permeance equal to or less than 0.02 L/s-m2 at 75 Pa pressure differential tested according to ASTM E2178 or E283.

(Ord. No. 019528, § 1, 8-1-2023)

Ask a question about El Paso law

Corpus searches the El Paso sections it holds and shows the ones that match, with their citations. Free, no sign-in.