Grease/Grit Reducing Device (GRD) Requirements.
Tyler City Code § 19-122
in effectSec. 19-122 Grease/Grit Reducing Device (GRD) Requirements.
a. Grease/Grit Reducing Device (GRD) plans and specifications must be reviewed and approved by the City of Tyler Building Inspection Department and the Industrial Pretreatment Program prior to installation. Prior to placing any new GRD into operation, the City of Tyler Building Inspection Department and the Industrial Pretreatment Program shall inspect GRD to assure compliance of approved GRD(s). No new Generator will be allowed to initiate operations until a proper GRD is installed by Generator's Operator in accordance with this Ordinance, and is approved by the City.
b. Plan and specification submittals to the City shall include as-built plans for GRD(s) (including all plumbing connections), GRD specifications and manufacturer details, site plans that clearly identify the location of GRD(s), including dimensions from site features so as to allow ease of locating said GRD(s), and capacity design justification details and calculations.
c. GRD(s) shall be installed in accordance with the City's most recently adopted version of the International Plumbing Code, and with the requirements contained in all applicable local plumbing codes, and must be installed by a licensed plumbing contractor.
d. The Operator must notify the City 48 hours in advance, during the normal work week, when GRD is ready for final inspection by the City. The City must give final approval prior to the Operator covering any GRD. Where the City denies approval of GRD for a new Generator, the City may elect to submit a request to the appropriate building official requesting that certificates of occupancy be withheld until GRD is constructed in accordance with this specification and is approved by the City.
e. Generators shall discharge all wastes from sinks, dishwashers, and drains into an approved, properly maintained, and functioning GRD before such waste enters the sanitary sewer.
f. Wastewater from domestic facilities and other similar fixtures may not be introduced into GRD by the Generator under any circumstance.
g. GRD(s) shall be located outside of a food preparation, serving, and/or consumption area. Under-sink GRD(s) are not allowed.
h. GRD(s) shall be constructed to provide a two-way three-inch (3") or larger cleanout on the effluent side. Sampling stations may be required if cleanouts are inadequate or not available for sampling purposes. Sampling stations shall be required for all new construction installations and modifications of existing GRD(s).
i. GRD(s) shall be located a minimum of ten (10) feet from receptacles that could discharge hot water. All hot water that is discharged must cool down to a minimum of 120 degrees Fahrenheit before reaching GRD.
Source: City of Tyler, Texas, Code of Ordinances and Charter (American Legal Publishing, codelibrary.amlegal.com)URL: https://codelibrary.amlegal.com/codes/tyler/latest/tyler_tx/0-0-0-104688Fetched: 11/14/2026