Sec. 29-197. - Advanced grading plan requirements.
(a) All advanced grading projects shall be performed under plans approved in conformance with the requirements of this section or as approved by the commission. (b) Once clearing and grading operations commence, the work described in the plan shall be expeditiously completed in the time frame set forth in the plan unless specifically limited by the grading permit and shall not exceed one (1) year in duration from the time work commences to installation of all final erosion control measures and vegetation. (c) A survey, grading and drainage plan, storm water detention basin design and line of sight illustrations from adjacent streets and properties must be provided to the planning commission for review. (d) Plans shall provide for visual screening of the completed area by providing undisturbed perimeter buffer strips and earthen berms. In cases where maintenance of an undisturbed buffer is deemed not practical to provide screening, earthen berms, tree plantings or other suitable measures may be required. (e) Undisturbed areas designated for temporary buffers shall be kept undisturbed except for reasonable access to the site. The width of the temporary buffer strip shall be six (6) percent of the lot width and depth. The minimum width shall be fifty (50) feet where the subject property is adjacent to other properties, residential streets, collector streets and industrial streets. The minimum width shall be eighty (80) feet where the subject property is adjacent to city parks, and arterial streets. In no event shall these temporary strips be less than the width of the permanent buffers required for the development. The minimum required width shall not exceed one hundred (100) feet. (f) All buffers required in conjunction with an advanced grading project shall be considered temporary and shall be maintained until the property is developed. (g) Construction access points through the perimeter buffer zones shall be limited in number and constructed to the minimum width needed to facilitate access. A curved or angled road design should be provided to limit the visibility of the interior grading work from adjacent streets. (h) If the property has seven (7) or fewer trees per acre, screening of the site with berms, undisturbed buffer zones, and tree plantings may be omitted if a suitable vegetative soil cover is provided. (i) Stormwater detention must be constructed on-site in accordance with chapter 29, article IV. Design criteria and performance standards and maintained following the completion of grading activities. (j) At the completion of land alteration activities, a minimum of six (6) inches of suitable topsoil shall be placed over all disturbed areas and permanent vegetative cover shall be established. Topsoil shall be suitable clay or silt loam soil capable of supporting perennial vegetation. If on-site soil is suitable, the topsoil may be stripped from the site prior to grading, or suitable soil may be brought in from off-site. (k) A permanent vegetative cover of suitable perennial grass shall be established over all disturbed areas. Where indicated by soil tests, ph adjustment and the addition of fertilizer may be required. (l) All erosion and stabilization controls, including permanent vegetation and plantings, and stormwater detention systems, are to be maintained by the responsible party for a period of two (2) years following the completion of site grading. Periodic mowing, generally twice per year or more often if required by the City of Little Rock Code or Ordinances, shall be provided to encourage perennial grass growth. (m) Maintenance for the two-year period shall be guaranteed through posting of cash, surety bond or letter of credit as referenced in subsection 31-431(2) at the time of final inspection of the grading activities. (n) All required federal, state and local permits and approvals shall be obtained prior to commencement of land alteration activities.
(Ord. No. 20,588, § 1, 6-5-12)
Ask a question about Little Rock law
Corpus searches the Little Rock sections it holds and shows the ones that match, with their citations. Free, no sign-in.