Sec. 25-92. - Minimizing the impacts of work in the rights-of-way.

(a) Noise, dust, debris, hours of work. Each right-of-way user shall conduct work in such a manner as to avoid unnecessary inconvenience and annoyance to the general public and occupants of neighboring property. In the performance of the work, the right-of-way user shall take appropriate measures to reduce noise, dust, and unsightly debris. No excavation work shall be done between the hours of 5:00 p.m. and 8:00 a.m., except with the written permission of the city engineer, or in case of an emergency activity. Bore time for any work area within four (4) feet of any high-risk main is further restricted to the following schedule: 8:00 a.m. to 4:00 p.m. Monday through Thursday, 8:00 a.m. to noon on Friday and no bore on Saturday and Sunday without prior written approval of the city engineer, a ten-business day advance written notification to the facility owner, and payment of applicable overtime fees established. Missiles are not considered to be an acceptable directional boring method and are not allowed unless otherwise approved in writing by the city engineer in advance. City may grant an exception to the operating hours if necessary. (b) Trash and construction materials. Each right-of-way user shall maintain the work area so that: (1) Trash and construction materials are contained so that they are not blown off the construction site, or viewed as litter within the work area itself; (2) Trash is removed from a construction site for proper disposal off-site often enough so that it does not become a health, fire, or safety hazard; and (3) Trash dumpsters and storage or construction trailers are not placed in the street without written approval of the city engineer. (c) Deposit of dirt and material on streets. Each right-of-way user shall eliminate the tracking of mud or debris upon any street or sidewalk. Equipment and trucks used during construction, excavation, or occupying a work area shall be cleaned of mud and debris prior to leaving any work site. (d) Protection of trees and landscaping. Each right-of-way user shall protect trees, landscape, and landscape features as required by the city engineer and shall be responsible for supplemental maintenance and watering during construction and until restoration is complete. All protective measures shall be provided at the expense of the right-of-way user. When directed by the city engineer, a right-of-way user shall trim trees, brush, or other landscaping overhanging facilities in a right-of-way under the supervision and direction of the city. The city shall not be liable for any damages, injuries, or claims arising from right-of-way users actions under this section. (1) Right-of-way users shall have the authority to trim trees upon and overhanging rights-of-way (including sidewalks and driveways), after providing written notice to affected customers, so as to prevent the branches of the trees from coming into contact with the wires and cables of the provider, provided that all trimming is done in compliance with the National Electric Safety Code and city Code provisions, and at no expense to the city. (e) Protection of paved surfaces from equipment damage. Backhoe equipment outriggers shall be fitted with rubber pads whenever outriggers are placed on any paved surface. Tracked vehicles with grousers are not permitted on paved surfaces unless specific precautions are taken to protect the surface. A right-of-way user shall be responsible for any damage caused to the pavement by the operation of such equipment and shall repair such surfaces. Failure to promptly complete required repairs, the city may repair such portion of the public rights-of-way that may have been disturbed by the right-of-way user, and the cost shall be charged to the right-of-way user. (f) Protection of property. Each right-of-way user, at its own expense, shall protect from injury any rights-of-way and adjoining property by providing trench protection and other measures necessary to shore up and protect all buildings, walls, fences, or other property likely to be damaged during the work and shall be responsible for all damage to public or private property resulting from failure to properly protect such property and carry out work in the rights-of-way. (g) Clean-up. As the work progresses, all rights-of-way and private property shall be thoroughly cleaned of all rubbish, excess dirt, rock, and other debris. All clean-up operations shall be done at the expense of the right-of-way user. Right-of-way user shall restore the work area to its original condition. All restoration work must be completed within twenty (20) business days following the date of substantial completion of the work in the right-of-way. Such clean-up and restoration shall be subject to the sole, reasonable approval of the city engineer. (h) Vehicle parking. Each right-of-way user shall make provisions for their employee and construction vehicle parking so that neighborhood parking and/or alternative access necessary for properties adjacent to a work area is always available. (i) Walkways. Each right-of-way user shall maintain an adequate and safe unobstructed walkway around the work area or blocked sidewalk in conformance with City Code, the Texas Manual of Uniform Traffic Control Devices, and Americans with Disabilities Act standards; as periodically revised. (j) Graffiti abatement. As soon as practical, but not later than fourteen (14) calendar days from the date right-of-way user receives notice thereof, the right-of-way user, shall remove all graffiti on any of its facilities located in the right-of-way. The foregoing shall not relieve the right-of-way user from complying with any city graffiti or visual blight ordinance or regulation. (k) Ownership. No part of any facilities placed on the right-of-way pursuant to this division will become or be considered by the city as being affixed to or a part of, the right-of-way, except for facilities accepted as city facilities by the city engineer in writing. All other facilities placed in the right-of-way pursuant to this division will be and remain the property of the agency and may be removed by the agency at any time, provided the agency shall obtain permits or give notice as required by this division. (l) Notifications. (1) Once a permit is issued, the right-of-way user shall be required to coordinate all notification and construction activities with the city inspector after permit issuance, within the timeframes specified on the permit. (2) Affected landowners: All landowners and residents that are affected and directly adjacent to the construction must be notified by the right-of-way user that construction will begin at least forty-eight (48) hours prior to the beginning of construction. The city engineer may require notification of additional property owners/residents, and/or notification further in advance, depending on the scope, type, location or nature of the construction. (3) General public: In addition to notice required for affected landowners, if in the opinion of the city engineer, the construction will have a regional impact including but not limited to disruption of traffic on an arterial or collector street, the right-of-way user may be required to give longer than forty-eight (48) hours' notice to the city inspector so that the proposed construction may be posted for advance notice to the public and emergency services personnel in on the city website, Denton Record Chronicle, DTV, or similar means of broadcast prior to the start of construction. (m) Traffic control plan. All work within the right-of-way impacting the intended use will require a detailed traffic control plan approved by the city engineer. Traffic control plans must comply with the requirements in the Right-of-Way Management Manual and Texas Manual of Uniform Traffic Control Devices (1) The right-of-way user shall provide the city engineer fifteen (15) days written notice before the closure of any arterial streets, seven (7) days written notice before closure of any local street, and twenty-one (21) days written notice before closure of any other highway, street, or interruption in traffic flow.

(Ord. No. 2019-2439, § I, 11-19-19)