For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 8-5-11 — Minimizing the Impacts of Work in the Rights-of-Way and Public Easements

Boulder Revised Code 1981 (Supplement167; ordinances effective through July30,2026; five publisher-pending ordinances held); partial · Boulder Revised Code 1981 § 8-5-11

Corpus is an independent public-information project, not the official City of Boulder website. Stable reference: corpuslaw.us/code/607b0e65-76e5-4493-b5c6-c26650e0b986

8-5-11. - Minimizing the Impacts of Work in the Rights-of-Way and Public Easements.

(a) Responsibility: No person shall fail to conduct work in such a manner as to avoid unnecessary inconvenience and annoyance to the general public and occupants of neighboring property. (b) Location of Utilities: Before any person begins work in any public right-of-way or public easement, it shall contact the Utility Notification Center of Colorado and make inquiries of all ditch companies, utility companies, districts, municipal departments and all other agencies that might have facilities in the area of work to determine possible conflicts. No person shall fail to contact the Utility Notification Center of Colorado and request field locations of all facilities in the area at least forty-eight hours in advance of commencing work. (c) Protection of Utilities: No person shall fail to support and protect all infrastructure, including, without limitation, pipes, conduits, poles, wires or other apparatus, which may be affected by the work from damage during construction performance of the work, or settlement of trenches subsequent to construction. (d) After Hours Work: Work activity performed in the public right-of-way or public easements may occur between the hours of 7 a.m. and 5 p.m. A person may request permission to perform work before 7 a.m. or after 5 p.m. in a public right-of-way or public easement, subject to city approval considering the type of work to be performed, the public necessity to have the work performed outside of normal hours, and the potential inconvenience or annoyance the work may have on the general public and occupants of neighboring property. Any approval to permit after-hours construction shall be subject to approval of a sound level variance, if necessary, prescribed under chapter 5-9, "Noise," B.R.C. 1981, and the applicant's agreement to pay the fee for after hours inspection prescribed under section 4-20-6, "Public Right-of-Way Permit and Contractor License Fees," B.R.C. 1981. (e) Noise: No person shall fail to comply with allowable noise levels prescribed under chapter 5-9, "Noise," B.R.C. 1981. (f) Trash and Construction Materials: No person shall fail to maintain the work site such that: (1) Trash and construction materials are contained and do not blow off the construction site; (2) Trash is removed from a construction site often enough so that it does not become a health, fire or safety hazard; and (3) Trash dumpsters, materials, storage trailers or construction trailers shall not be placed in the right-of-way unless approved with the right-of-way permit. (g) Dust and Erosion: No person shall fail to use appropriate measures, such as watering and best management environmental practices, to control dust and erosion at the construction site. (h) Deposit of Dirt and Material on Roadways: No person shall fail to comply with the requirements to eliminate the tracking of mud or debris upon any street or sidewalk as prescribed under section 8-2-10, "Deposit of Dirt and Material on Streets and Alleys Prohibited," B.R.C. 1981. Equipment and trucks used during construction, excavation or work activity shall be cleaned of mud and debris prior to leaving any work site. (i) Use of Street and Sidewalk Within the Right-of-Way or Public Easement: A permittee for a right-of-way construction permit shall: (1) Make provisions for employee and construction vehicle parking so that neighborhood parking adjacent to a work site is not impacted; (2) Obtain permission from the city manager to occupy public metered parking spaces and pay applicable parking reimbursement fees for any work activity that impacts public metered parking spaces, as set forth in section 4-18-8, "Parking Meter Hood and Sign Permits," B.R.C. 1981; (3) Maintain safe traffic operations along all public streets in conformance with section 8-5-10, "Traffic Control," B.R.C. 1981; (4) Maintain an adequate and safe unobstructed public walkway through or around the working construction site or blocked sidewalk in conformance with section 8-2-11, "Duty to Maintain Walkway Around Obstructed Portions of Sidewalks," B.R.C. 1981; (5) Clear all snow and ice hazards from public sidewalks or walkways through or around the work site by 12:00 noon following a snowfall in conformance with section 8-2-13, "Duty to Keep Sidewalks Clear of Snow," B.R.C. 1981; and (6) Secure all dangerous areas, such as trenches and excavations, with appropriate markers, barricades and/or fencing. (j) Protection of Trees and Landscaping: No person shall fail to protect trees, landscape and landscape features, nor shall any person improperly irrigate trees or landscaping so as to cause damage or loss, inconsistent with city code, the city's Design and Construction Standards and the City of Boulder Landscape Manual, or as otherwise required by the city. All protective measures shall be provided at the expense of the person performing work. Any damage to existing trees and landscaping shall be reported to the city manager for inspection. The person performing work shall be required to complete any remedial action necessary to repair and restore damaged trees and landscaping, as determined by the city manager. Any trees and landscape materials which are damaged beyond repair or restoration shall be replaced at an equivalent value to the damaged material at the expense of the person performing work. (k) Protection of Paved Surfaces from Damage: The permittee or any other person performing work shall be responsible for any damage caused to any pavement by any work activity. Upon order of the city manager, said person shall repair all damage to the satisfaction of the city manager. Failure to repair such damage will result in the use of the permittee's performance bond, financial guarantee or warranty by the city to repair any damage. To protect against pavement damage, backhoe equipment outriggers shall be fitted with rubber pads when used on pavement surfaces, and tracked vehicles are not permitted on paved surface unless specific precautions approved by the city manager are taken to protect the surface. (l) Protection of Property: No person shall fail to protect from injury any adjoining property by providing adequate support and taking other necessary measures. Said person shall, at their expense, shore up and protect all buildings, walls, fences or other property likely to be damaged during the work, and shall be responsible for all damage to public or private property resulting from failure to properly protect and carry out work in the public right-of-way and public easements. (m) Cleanup: As the work progresses, all public rights of way, public easements and private property shall be thoroughly cleaned of all rubbish, excess dirt, rock and other debris. All cleanup operations shall be done at the expense of the permittee or any other person performing work. (n) Preservation of Monuments: No person shall disturb any surface monuments or survey hubs and points found on the line of work unless approval is obtained from the city manager. Any monuments, hubs and points disturbed shall be replaced by a Colorado Registered Land Surveyor at the expense of the permittee or the person that is responsible for its removal. Ordinance Nos. 7687 (2009); 8721 (2026)

Ask a question about Boulder law

Corpus searches the Boulder sections it holds and shows the ones that match, with their citations. Free, no sign-in.