§ 8-03 Maintenance Program and Plan.
For each cooling tower system the owner must have a maintenance program and plan prepared by a qualified person in accordance with professional or industry bodies with expertise in cooling tower regulations and guidance, such as ANSI/ASHRAE 188, the manufacturer’s instructions, and the requirements of this Chapter. The plan must be retained and produced in accordance with subdivision (a) of 24 RCNY § 8-07. At a minimum, the plan must include and describe: (a) Management and maintenance team. Identification, including names and contact information (mail and email addresses and telephone numbers) and description of the function of each person on the cooling tower system management and maintenance team in a manner specified by the Department, including: (1) The owner of the building where each cooling tower system is located and any manager or other person designated by the owner as responsible for compliance with the requirements of Administrative Code § 17-194.1 and this Chapter. (2) Any person designated by the owner as a responsible person, as defined in 24 RCNY § 8-02. (3) Every consultant, service company and qualified person who cleans, disinfects, delivers chemicals or services the cooling tower system. (b) Cooling tower system. Identification, specifications and description of each cooling tower system and all components located at a specific address, including: (1) The number of cooling towers in the cooling tower system. (2) The location of each cooling tower in relation to the building and the building address, block and lot number. (3) The dimensions and characteristics of the cooling tower system including total recirculating water volume, cooling tower tonnage, biocide delivery method, flow rate and other key characteristics. (4) The purpose of the cooling tower system and seasonal or year-round operation including start and end date, if applicable. For systems with multiple cooling towers, conditional operation, such as cycling or scaling related to cooling demand, must also be noted. (5) The New York City Department of Buildings registration number for each cooling tower. (6) The cooling tower manufacturer, model number and serial number, if applicable. (7) A flow diagram or schematic of the cooling tower system, identifying all of the principal components and appurtenances of the cooling tower system including makeup water and waste stream plumbing locations. (c) Risk management assessment. The assessment must identify risk factors for Legionella proliferation and specify risk management procedures for all or parts of each cooling tower system, and anticipated conditions including: (1) Any dead legs or stagnant water in the recirculation system. (2) Operating configurations and conditions that may result in low flow or no flow in any part of the cooling tower system. (3) System parts that require continual operation throughout the year making regular, periodic offline cleaning and disinfection difficult. (4) Any components that may add additional risk factors for organic material buildup and microbial growth such as strainers and out-of-use filters. (5) Sources of elevated organic contamination, including, but not limited to windblown debris, bird waste and plant material. (6) Design configurations that present risk of direct sun exposure on basin, deck or fill. (7) Ventilation intakes or other routes for human exposure to cooling tower aerosols. (8) System components adversely affecting water quality management procedures. (9) Other risk or limiting factors or constraints in the cooling tower system's design and functioning. (d) Cooling tower operation. (1) Control measures, corrective actions, documentation, including a written checklist for routine monitoring, and reporting that comply with 24 RCNY §§ 8-04 through 8-08 and any routine maintenance activities recommended by the manufacturer's instructions, including performance measures, which may sufficiently demonstrate adequate implementation of the operation requirements described in the maintenance program and plan. Where there is a conflict between the requirements of this Chapter, Part 4 of the State Sanitary Code, § 17-194.1 of the Administrative Code, and the manufacturer's instructions, the maintenance program and plan must reflect the most stringent requirement. (2) Specific, detailed seasonal and temporary shutdown and startup procedures. (3) Notification and communication strategies among management and maintenance team members regarding the required corrective actions in response to process control activities, monitoring, sampling results and other actions taken to maintain the cooling tower system. (4) A valve schedule for each operating configuration and condition including, at a minimum, any times when cooling tower component(s) are brought online. (e) Plan preparer certification. The maintenance program and plan must be annually certified by a qualified person, in a manner specified by the Department, who must attest that the program and plan (1) meets the requirements of this Chapter, § 28-317.3 and § 17-194.1 of the New York City Administrative Code, and all applicable requirements of the New York City Health Code and (2) reflects any changes made to the management and maintenance team, system design, operation or system control requirements for the cooling tower system. (Added City Record 4/7/2016, eff. 5/7/2016; amended City Record 4/8/2026, eff. 5/8/2026)
Ask a question about New York law
Corpus searches the New York sections it holds and shows the ones that match, with their citations. Free, no sign-in.