Sec. 10-64. - Inspections.
(a) Generally. (1) Upon issuance of a building permit for construction or work for which a building permit is required, such construction or work shall be subject to inspection and shall remain accessible and exposed for such inspection until the construction or work is approved. (2) Approval as a result of an inspection shall not be construed to be an approval of a violation of the provisions of this code or of other ordinances of the city. It shall be the responsibility of the building permit holder to notify the building official when construction or work is ready for inspection. Neither the building official nor the city shall be liable for expense entailed in the removal or replacement of any material that is required to allow inspection. (3) The building official is authorized to accept reports of approved inspection agencies, provided such agencies satisfy the requirements as to qualifications and reliability. (4) The building official may require retest of any installation or assembly on which a report has been filed and, in the case of substantial discrepancy in the results of the test, may suspend any agency's privilege to file the report in lieu of actual inspection. (5) Required inspections shall include but not be limited to the following: a. Plumbing inspection. 1. Rough-in. This is the first inspection, which shall consist of the water or air test on all potable water lines, waste and vent piping and is performed prior to covering. 2. Final. The final inspection shall be made when all fixtures are set and work is completed and operating. b. Electrical inspection. 1. Rough-in. This is the first inspection, which shall consist of all conduit, semi rigid piping or wiring being in place prior to covering. 2. Final . The final inspection shall be made when the work is completed and operating. c. Mechanical inspection. 1. Rough-in. The first inspection shall be made when all duct and pipe work is in place before it is covered. 2. Final. Final inspection shall be made when the system is completed and operating. d. Footing, caisson inspection. Footing or caisson inspection shall be made after trenches or caissons are excavated and the forms are erected but before the concrete is deposited. If engineered footings are to be used, a copy of the engineer's report must be submitted to the building inspector at this time. e. Form survey. Setbacks shall be verified by a survey signed and sealed by a registered surveyor performed after the foundation forms are set and submitted prior to the placement of concrete in the forms. Exception: Additions, detached Group U occupancies, remodels and renovations f. Framing inspection. The framing inspection shall be made after wall and roof framing are completed, bracing and fire stops are in place and all pipes, wires and vents are complete. g. Final inspection. The final inspection shall be made at the time the contractor feels the building or structure fulfills all requirements for a certificate of occupancy. (b) Inspection requests. Any person or entity issued a building permit or their duly authorized agent shall notify the building official when work is ready for inspection. It shall be the responsibility of any person or entity issued a building permit to call for an inspection before the building permit expires. It shall be the responsibility of the building permit holder to provide access to and means for inspections of such work that are required by the Building Code. (c) Reinspections. A reinspection fee may be imposed for each inspection or reinspection when such portion of work for which inspection is called is not complete or when corrections called for are not made. This section is not to be interpreted as requiring reinspection fees the first time a job is rejected for failure to comply with the requirements of this Building Code. Reinspection fees may be imposed when the inspection record card is not posted or otherwise available on the worksite, the approved plans are not readily available to the inspector, for failure to provide access on the date for which inspection is requested or for deviating from plans requiring the approval of the building official. Where reinspection fees have been imposed no inspection will take place until the required reinspection fees have been paid. Reinspection fees shall be in amounts as established in the schedule of fees established from time to time by resolution of the city council. (d) Approval required. (1) Work shall not be performed on any portion of a building, structure or utility beyond the point indicated in each successive inspection without first obtaining the approval of the building department. Such approval shall be given only after an inspection shall have been made of each successive step in the construction as indicated by each of the inspections in this section. (2) Foundation work, reinforcing steel or the structural framework of any part of any building, structure or utility shall not be covered or concealed in any manner whatever without first obtaining the approval of the building official. (e) Stop work orders. Whenever the building official finds any work regulated by the Building Code being performed in a manner either contrary to the provisions of this Building Code or dangerous or unsafe, the building official is authorized to issue a stop work order. (1) Issuance. The stop work order shall be in writing and shall be given to the owner of the property involved, or to the owner's agent, or to the person doing the work or conspicuously posted on the site. Upon issuance of a stop work order, the cited work shall immediately cease. The stop work order shall state the reason for the order, and the conditions under which the cited work will be permitted to resume (2) Unlawful continuance. It is unlawful for any person to continue any work after having been served with a stop work order, except such work as that person is directed to perform to remove a violation or unsafe condition by the building official. (3) Unlawful removal. It is unlawful for any person to remove or deface any stop work order posted on property pursuant to this subsection (f) unless resumption of work is authorized by the building official. (f) Connection of service utilities. (1) No person shall make connections from a utility, source of energy, fuel or power to any building or system that is regulated by the Building Code for which a building permit is required, until released by the building official. (2) The building official shall have the authority to authorize the temporary connection of the building or system to the utility source of energy, fuel or power. (3) The building official shall have the authority to authorize disconnection of utility service to the building, structure or system regulated by the Building Code, and the referenced codes and standards set forth in Section 10-3 in case of emergency where necessary to eliminate an immediate hazard to life or property or when such utility connection has been made without the approval required by this Building Code. The building official shall notify the serving utility, and wherever possible the owner and occupant of the building, structure or service system of the decision to disconnect prior to taking such action. If not notified prior to disconnecting, the owner or occupant of the building, structure or service system shall be notified in writing, as soon as practical thereafter. (g) Certificate of occupancy. (1) No building or structure shall be used or occupied, and no change in the existing occupancy classification of a building or structure or portion thereof shall be made until the building official has issued a certificate of occupancy therefor as provided herein. Issuance of a certificate of occupancy shall not be construed as an approval of a violation of the provisions of this Building Code, regulations or standards or of any other ordinances of the City of Thornton. A certificate of occupancy shall be issued for completion of a project in accordance with the International Building Code, as adopted in Section 10-151, or the International Residential Code, as adopted in Section 10-164, or the International Existing Building Code, as adopted in Section 10-176, otherwise a letter of compliance shall be issued upon the completion of a job following the final inspection if it is found that all licenses and building permits are in order, the building complies with the provisions of this Building Code and other applicable municipal regulations and the use of the structure is a permitted use. Exception: Certificates of occupancy are not required for work exempt from building permits under Section 10-61(c). (2) After the building official inspects the building or structure and finds no violations of the provisions of Building Code or other laws that are enforced by the building department, the building official shall issue a certificate of occupancy that contains the following: 1. The building permit number; 2. The address of the structure; 3. The name and address of the owner; 4. A description of that portion of the structure for which the certificate is issued; 5. A statement that the described portion of the structure has been inspected for compliance with the requirements of the Building Code for the occupancy and division of occupancy and the use for which the proposed occupancy is classified; 6. The name of the building official; 7. The edition of the Building Code under which the building permit was issued; 8. The use and occupancy of the building or structure; 9. The type of construction the building or structure is built to; and 10. Any special stipulations and conditions of the building permit. (3) The certificate of occupancy shall be posted in a conspicuous place on the premises and shall not be removed except by the building official. Exception: Dwelling units and Group U occupancies shall not be required to post the certificate of occupancy. (4) The building official is authorized to issue a temporary certificate of occupancy before the completion of the entire work covered by the building permit, provided that such portions can be occupied safely as determined by the building official, and all applicable fees have been paid. The building official shall set a time period during which the temporary certificate of occupancy is valid. The temporary certificate of occupancy fee is in an amount established by the scheduled of fees adopted by resolution. (5) The building official is authorized to, in writing, suspend or revoke a certificate of occupancy or completion issued under the provisions of this Building Code wherever the certificate is issued in error, or on the basis of incorrect information supplied, or where it is determined that the building or structure or portion thereof is in violation of any ordinance or regulation or any of the provisions of this Building Code. (h) Change of occupancy. A change of occupancy is defined as a change in the ownership of a building, change in the ownership of a business, a change in the business name, or a change in the use of a building. A change of use is not limited to a change of classification. Every change of occupancy requires the issuance of a new certificate of occupancy following a safety inspection and approval by the building official. (i) Letter of compliance. Any work completed in compliance with a building permit for which a certificate of occupancy is not issued pursuant to this Building Code shall be issued a letter of compliance; if following the final inspection it is found that all licenses are issued, the building complies with the provisions of this Building Code and other applicable municipal regulations, and the use of the structure is a permitted use.
(Code 1975, § 44-29; Ord. No. 1530, 2-10-86; Ord. No. 2203, § 12, 10-12-92; Ord. No. 2384, § 13, 11-27-95; Ord. No. 2731, § 3, 10-8-02; Ord. No. 3136, § 1, 7-13-10; Ord. No. 3252, § 5, 7-23-13; Ord. No. 3538, § 2, 9-10-19; Ord. No. 3615, § 1, 1-11-22)
Ask a question about Thornton law
Corpus searches the Thornton sections it holds and shows the ones that match, with their citations. Free, no sign-in.