For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 4.14 — Certificate of Occupancy

Code of the City of Arlington, Texas (City Secretary chapter PDFs as posted 2026-11-07, each current through the ordinance named on its cover, with the City Secretary's adopted-not-yet-codified Ordinances 25-063, 25-069, 25-073, 25-074, 25-075, 25-084, 26-003, 26-004, 26-019, 26-024 and 26-027 applied; Anti-Discrimination chapter not included) · Arlington City Code, Construction Chapter, § 4.14

Corpus is an independent public-information project, not the official City of Arlington website. Stable reference: corpuslaw.us/code/6e81d47b-2f1d-43b3-a471-076a56f53610

Section 4.14 Certificate of Occupancy

A. When required. No premises, building or structure shall be used or occupied until a Certificate of Occupancy has been issued as provided herein. A certificate of occupancy is required when: 1. The initial occupancy of a building or tenant space. 2. To change the tenancy or tenant of building or tenant space. 3. To change the name or ownership of a business. 4. A shell Certificate of Occupancy shall not permit the occupancy of the structure for any purposes. A shell Certificate of Occupancy is for purposes of utility releases for house meters. 5. A "clean and show" certificate of occupancy shall not permit the occupancy of the structure, with the exception of cleaning and preparing the building or tenant space for showing prospective tenants. B. Reserved. C. Certificate Issued. The Building Official shall issue a Certificate of Occupancy upon a finding that the premises complies with the Building Code, provisions of the "Unified Development Code" Chapter of the Code and all other applicable development regulations of the City of Arlington. For new structures or when the occupant is of a different character of occupancy or use from the previous certificate holder, the Building Official shall make an inspection. Where no change in character of occupancy is proposed for a structure previously granted a Certificate of Occupancy, no inspection is necessary unless specifically required by the Building Official. In the event that a tenant space is being altered, enlarged or reduced in size, or if the Building Official, or an authorized representative, believes that the previous tenant altered the space without benefit of permits, an inspection may be required prior to the occupancy. Other City departments may require inspections prior to the granting of a Certificate of Occupancy. Issuance of a Certificate of Occupancy shall not be construed as an approval of a violation of the provisions of this code or of other ordinances of the jurisdiction. An applicant for a Sexually Oriented Business as required by the Sexually Oriented Business Chapter of the City Code must first obtain a Certificate of Occupancy for a Sexually Oriented Business from the Building Official. The Building Official shall issue or deny a Certificate of Occupancy to a Sexually Oriented Business not more than sixty (60) business days subsequent to the date of the applicant’s submission of such application to the Building Official. Such application for a Certificate of Occupancy shall be deemed approved if not approved or denied within such time period. The Certificate of Occupancy shall contain: 1. The address of the building; 2. The name of the business located at said premises, building or structure; 3. The allowable zoning use and occupancy for which the certificate is issued; 4. The zoning district in which the use is located; 5. A description of that portion of the structure for which the certificate is issued; 6. A statement that the described portion of the structure has been inspected for compliance with the requirements of this code; 7. The name of the building official; 8. The edition of the code under which the certificate was issued; 9. The type of construction as defined in Chapter 6 of the International Building Code; 10. The design occupant load; 11. Where an automatic sprinkler system is provided, whether the sprinkler system is required; and 12. Any special conditions of the granting of the certificate. D. Temporary Certificate of Occupancy. A temporary Certificate of Occupancy may be issued by the Building Official for the use of a portion or portions of a building, structure, or site prior to the completion of the entire building, structure or site improvements but only if that portion or portions can be occupied safely. The Building Official shall set a time period during which the temporary Certificate of Occupancy is valid. E. Posting. The Certificate of Occupancy shall be posted in a conspicuous place on the premises and shall not be removed without permission of the Building Official. F. Revocation. The Building Official may, in writing, suspend or revoke a Certificate of Occupancy or a temporary Certificate of Occupancy issued under the provisions of this Code whenever the certificate is issued in error, or on the basis of incorrect information supplied, or when it is determined that the building or structure or portion thereof is in violation of any ordinance or regulation or any provision of this Code or other provisions of law. Upon suspension or revocation of a Certificate of Occupancy, the Building Official shall have the authority to disconnect, or to order the electricity supply agency to disconnect, all electric service to any premises affected by the revoked or suspended Certificate of Occupancy. G. Permits, Inspections, Certificates and Approvals for Sexually Oriented Businesses. The provisions of Subsections 4.01 (H), (I) and (J) of the Sexually Oriented Business Chapter of the Code of the City of Arlington, Texas, 1987, apply and prevail over any provision of this Construction Chapter with respect to the processing of applications, permits, inspections, certificates and approvals regarding sexually oriented businesses. H. Application Required. Any person, firm or corporation desiring to initially occupy a building or tenant space, to change the tenancy of building or tenant space, change the name or ownership of a business, to clean and show a building or tenant space or to acquire a Certificate of Occupancy for a shell building must complete an application and submit to the Building Official for review along with the application fee as set forth by resolution by the City Council. The application shall contain the following information: 1. The address of the application, 2. The proposed business name of the occupant and/or tenant, 3. The proposed use of the building or tenant space, 4. The gross floor area of the proposed use, 5. The individual’s name of the principal or owner of the proposed use of the building or lease space, or the name of a presiding officer of a firm, corporation, partnership or other business entity of the proposed use of the building or lease space, 6. The mailing address (other than location being applied for) of the principal or owner, 7. The Texas Driver’s License number or other government issued picture identification of the principal or owner, 8. Proof of Texas Sales and Use Tax Certificate or Tax-Exempt Certificate with a valid City of Arlington business locations for proposed businesses that will collect a sales and/or use tax, and 9. Other information as determined necessary for the building official to determine that the proposed use satisfies all the development regulations of the City of Arlington. The application shall be submitted and signed by the principal, owner or designated agent of the principal or owner and the designated agent’s Texas Driver’s License number or other government issued picture identification certifying that the applicant is authorized agent so empowered to make the application on behalf of the principal or owner and agrees to be subject to the same rules of review and approval as the principal or owner.

Ask a question about Arlington law

Corpus searches the Arlington sections it holds and shows the ones that match, with their citations. Free, no sign-in.