Computations and plans.
Round Rock Zoning and Development Code, art. VII, § 4-87
in effectSec. 4-87. - Computations and plans.
(a) Sealed engineered plans for proposed drainage facilities shall be submitted to the PDS director for acceptance prior to construction.
(b) Computations for all drainage related design shall be submitted with the application for either a site development permit or subdivision improvement permit. Data submitted shall include a drainage area map, a summary of methodology employed and resulting data, land use and runoff coefficient assumptions and other pertinent hydrologic and hydraulic data. Additional data may be required by the city engineer.
(c) Certification shall be submitted by an engineer licensed in the State of Texas that the plans and computations are in compliance with the requirements of this chapter.
(d) Following construction, but prior to acceptance of improvements by the city, the design engineer shall furnish certification that based upon his or her periodic inspection of the work all improvements, including those covered by this section, have been constructed in compliance with the city's requirements.
Source: City of Round Rock, Texas, Code of Ordinances (Municode Library, library.municode.com)URL: https://library.municode.com/tx/round_rock/codes/code_of_ordinances?nodeId=PTIIIZODECO_CH4SUDECO_ARTVIISTDR_S4-87COPLFetched: 11/16/2026
