Round Rock Zoning and Development Code, art. VII, § 4-85 General policies.
Sec. 4-85. - General policies.
(a) Stormwater drainage improvements shall be provided for the subdivision or addition. Stormwater impacts resulting from new development must not adversely affect any properties, including those abutting, downstream, and in upstream areas. Stormwater drainage facilities shall be designed by an engineer licensed to practice in Texas and in compliance and in accordance with this chapter, the Design and Construction Standards, and generally recognized and accepted engineering practices. Privately maintained stormwater drainage facilities including channels and swales located outside a public easement shall follow all requirements of the Drainage Design and Construction Standards, with exceptions for the following components: pipe material, pipe size, junction structures, inlets, roof drains, and minimum depth requirements. Variations to the aforementioned components shall not violate the International Plumbing Code, with local amendments, and must be approved by the zoning administrator. Variations are not permitted for any residential use.
(b) The ultimate 4% and ultimate 1% annual chance floodplains shall be determined for watercourses draining 50 or more acres. Calculations for floodplains shall utilize generally recognized backwater computational methods and actual field channel and overbank configuration.
(c) At a minimum, all stormwater drainage facilities shall be engineer-designed to intercept and transport the projected runoff from a 4% annual chance event. In addition, those flows greater than a 4% annual chance event up to and including a 1% annual chance event shall be contained within private streets, public streets, drainage easements, or a combination thereof.
(d) All stormwater drainage facilities shall be designed to prevent the erosion of existing and proposed on-site and off-site facilities.
(e) Projected runoff rates for the design and analysis of stormwater drainage facilities shall be based on the expected ultimate developed state of the upstream contributing area and shall apply to any and all references to floodplain, flows, design frequencies or any other hydrologic and hydraulic reference found in this chapter.
(f) The requirements provided in this chapter shall not relieve the owner of responsibility under state law to adjacent, upstream, and downstream property owners.