Building permits.
Round Rock Zoning and Development Code, art. VII, § 4-92
in effectSec. 4-92. - Building permits.
(a) Plans submitted for building permits other than single-family residential or duplex construction shall include the necessary drainage related facilities designed and provided for in compliance with this chapter and the drainage criteria manual.
(b) Plans and design calculations for all drainage facilities shall be submitted to the PDS director for review and approval prior to issuance of the building permit.
(c) The design engineer shall certify that the plans and calculations for all drainage facilities are in compliance with the ordinances of the city.
(d) Following construction, but prior to issuance of a certificate of occupancy, the design engineer shall certify that the public works improvements, including those covered by this section, have been constructed in compliance with the city's requirements based on his/her inspection of the completed work.
Source: City of Round Rock, Texas, Code of Ordinances (Municode Library, library.municode.com)URL: https://library.municode.com/tx/round_rock/codes/code_of_ordinances?nodeId=PTIIIZODECO_CH4SUDECO_ARTVIISTDR_S4-92BUPEFetched: 11/16/2026
