§ 9-9-8 — Reservations, Dedication, and Improvement of Rights-of-Way
Boulder Revised Code 1981 (Supplement167; ordinances effective through July30,2026; five publisher-pending ordinances held); partial · Boulder Revised Code 1981 § 9-9-8
Corpus is an independent public-information project, not the official City of Boulder website. Stable reference: corpuslaw.us/code/7a315bbe-3c69-46ff-98e1-2cdac8863f03
9-9-8. - Reservations, Dedication, and Improvement of Rights-of-Way.
(a) Purpose: The city is authorized to acquire right-of-way by purchase, gift, or condemnation. Additionally, the city is also instructed to establish and maintain a city street system pursuant to §§ 43-2-123 to 43-2-125, C.R.S. The purposes of this section are: (1) To ensure public access to all lots and parcels of land and for the provision of fire, police and emergency services, mail delivery, garbage collection and recycling services, and public and quasi-public utility services. (2) To promote and create an interconnected city through acquisition of right-of-way to allow for transportation systems that provide for the integrated and multi-modal movement of all modes of transportation including, without limitation, pedestrians, bicycles, skaters, and motor vehicles. (3) To create an interconnected transportation system that will enhance the safe, convenient, and efficient movement of all modes of transportation. (4) To provide for the installation or placement of utility services including, without limitation, water, sewer, electricity, gas, drainage, telephone, and cable television services for properties abutting city streets and alleys. (5) To establish minimum standards for public rights-of-way and public improvements in order to ensure the consistent and equitable provision of public streets and alleys. (b) Conformance With the Comprehensive Plan and Right-of-Way Plans: The arrangement, character, extent, and location of all rights-of-way shall conform to the Boulder Valley Comprehensive Plan and to all right-of-way plans approved by the city council, including, without limitation, the North Boulder Right-of-Way Plan and the Transportation Master Plan. No person shall place any structure in an area designated as a public street, alley, bike path, path, or sidewalk in the Boulder Valley Comprehensive Plan or any other right-of-way plan approved by the city council. (c) Reservation of Right-of-Way: (1) Streets Designated as Collectors or Greater: If the Boulder Valley Comprehensive Plan requires a greater width for an abutting street than thirty feet from the centerline, and the additional right-of-way is not required by subsection (d) of this section to serve the subject property, then the area beyond thirty feet from the centerline shall be reserved for future purchase by the city. (2) Approved Right-of-Way Plans: All right-of-way on the property as shown on the Boulder Valley Comprehensive Plan, Transportation Master Plan, or approved right-of-way plan shall be reserved for future dedication to or purchase by the city. (3) Modification of Right-of-Way Plans: Rights-of-way, not designated by the Transportation Master Plan, required to be reserved or dedicated pursuant to paragraph (c)(2) of this section may be modified. The city manager is authorized to adopt rules pursuant to chapter 1-4, "Rulemaking," B.R.C. 1981, as amended, to provide for the modification of right-of-way plans. For the purposes of this paragraph, modification means a change which introduces new elements into the details, or cancels some of the elements, but leaves the general purpose and effect of the plan intact. A modification may include, without limitation, moving the location of a street or right-of-way, changing the width of a right-of-way, or the design standards for a street cross section. (4) Right-of-Way Width: A reservation area for right-of-way shown on an approved street plan shall not be less than sixty feet in width. The reservation area shall be wider if an approved street plan anticipates the need for a larger street. (5) Setback From Reservation Area: The setback shall be as set forth in chapter 9-7, "Form and Bulk Standards," B.R.C. 1981, or the reservation area boundary, whichever is greater. (d) Dedication of Right-of-Way: At time of annexation, subdivision, or issuance of a building permit for new development, or redevelopment involving a change in use or the addition of a dwelling unit, all street and alley rights-of-way abutting, crossing, and necessary to serve the subject property as designated in the Boulder Valley Comprehensive Plan or an approved right-of-way plan, or as proposed as part of any project or development proposal, shall be dedicated to the city as set forth in this section. (1) Right-of-Way Dedication Required for New Streets and Alleys: The right-of-way required for a new street or alley shall be wide enough to include and accommodate all of the necessary public improvements: the paved roadway section including, without limitation, travel lanes, turning and speed change lanes, transit lanes, bicycle lanes, and parking lanes; curbs and gutters or drainage swales; roadside and median landscaping areas; sidewalks; and any necessary utility corridors. The minimum width of right-of-way to be dedicated shall be: (A) New streets - sixty feet; (B) New alleys - twenty feet; or (C) In accordance with the City of Boulder Design and Construction Standards, approved pursuant to chapter 9-12, "Subdivision," B.R.C. 1981, for residential streets and alleys. (2) Right-of-Way Dedication Along Existing Streets: The city manager will require dedication of additional right-of-way along existing streets if the impacts generated by the existing use or new use are roughly proportionate to the dedication required, after considering any of the following conditions: (A) The existing right-of-way abutting the subject property is narrower than the right-of-way abutting adjacent properties within the street block and is narrower than the minimum right-of-way width required by paragraph (d)(1) of this section. (B) The existing street right-of-way has not previously been improved with street paving, curbs and gutters, and sidewalks meeting previous or current city standards and is narrower than the minimum right-of-way width required by paragraph (d)(1) of this section. (C) Additional right-of-way is required pursuant to paragraph (d)(3) of this section. (3) Additional Right-of-Way Dedication: The city manager may require right-of-way dedication in excess of the right-of-way dedication requirements set forth in this subsection if public right-of-way improvements that provide a benefit to and are necessary to serve the subject property or development require additional right-of-way. (4) Dedication Not Required: Dedication of additional right-of-way will not be required along existing streets or alleys where the existing right-of-way has been improved with street paving, curbs and gutters, and sidewalks meeting previous or current city standards and the impacts of proposed development or redevelopment would not require additional public right-of-way improvements as set forth in paragraph (d)(3) of this section, or where the existing right-of-way is wider than the minimum right-of-way width set forth in paragraph (d)(1) of this section and the impacts of proposed development or redevelopment would not require additional public right-of-way improvements pursuant to paragraph (d)(3) of this section. (e) Dedication of Rights-of-Way for Other Than Streets and Alleys: Rights-of-way for utilities and transportation movements other than streets or alleys shall be dedicated to the city, purchased by the city, or funds sufficient for purchase shall be provided to the city, if and to the extent that such right-of-way provides a benefit to a property or offsets an impact of the annexation, subdivision, or development of the property, as the case may be, that is roughly proportionate to the cost of the dedication. (f) Apportionment of Costs: The city manager may assess the acquisition costs of any right-of-way area and all public improvements required to construct a street, alley, bike path, path, or sidewalk thereon to other property owners in the surrounding area, if and to the extent that the street provides a benefit to a property that is roughly proportionate to the cost of such dedication or improvement. Such costs shall be collected no later than the time of annexation, subdivision, issuance of a building permit for new development, or redevelopment involving a change of use or the addition of at least one dwelling unit. (g) Right-of-Way Improvements: All street, alley, or pedestrian rights-of-way abutting, crossing, and necessary to serve the subject property shall be improved at the time of issuance of a building permit for new development, or redevelopment involving a change of use or the addition of a dwelling unit. [10] All right-of-way improvements shall meet the following standards: (1) Right-of-Way Improvements for New Streets and Alleys: The right-of-way improvements required for new streets and alleys shall meet or exceed the following minimum standards: (A) The right-of-way improvements shall include the following elements: the roadway paving including, without limitation, travel lanes, turning and speed change lanes, transit lanes, bicycle lanes, and parking lanes; curbs and gutters or drainage swales; roadside and median landscaping; sidewalks and trails; and any necessary utilities. (B) The minimum right-of-way improvements for new streets and alleys shall meet or exceed the base street standards, or residential street and alley standards approved pursuant to chapter 9-12, "Subdivision," B.R.C. 1981, required in the City of Boulder Design and Construction Standards. (2) Right-of-Way Improvements to Existing Streets and Alleys: The city manager may require right-of-way improvements up to the half width or centerline of the right-of-way along existing streets and alleys given any of the following conditions: (A) The existing street right-of-way has not previously been improved with street paving, curbs and gutters, and sidewalks meeting previous or current city standards. (B) Additional right-of-way improvements are required pursuant to paragraph (d)(3) of this section. (C) Sidewalk construction or reconstruction is required by section 8-2-17, "When Sidewalks Are to Be Constructed or Reconstructed," or 8-2-22, "Sidewalk Required Prior to Issuance of Building Permit," B.R.C. 1981. (3) Additional Right-of-way Improvements: The city manager may require right-of-way improvements in excess of the right-of-way improvement requirements set forth in this section, if public right-of-way improvements that directly benefit and are necessary to serve the subject property or development require additional right-of-way improvements. (4) Improvements Not Required: Right-of-way improvements will not be required if: (A) The city manager has determined that right-of-way improvements are not appropriate at the time of development or redevelopment, given the future construction of right-of-way improvements completed as part of a planned or scheduled public improvements project as designated in the Boulder Valley Comprehensive Plan, Transportation Master Plan, capital improvements program or an approved right-of-way plan, and the city manager has accepted a suitable and adequate financial guarantee to guarantee the completion of the minimum and required right-of-way improvements that directly benefit and are necessary to serve the subject property. (B) Along existing streets or alleys, the existing right-of-way has been improved with street paving, curbs and gutters, and sidewalks meeting previous or current city standards and the impacts of proposed development or redevelopment would not require additional public right-of-way improvements pursuant to this section. (C) The right-of-way improvement would be for an alley located in low-density and medium-density residential zoning districts; such alley improvements are only required as part of an assessment district. (h) Subdivision Requirements: The requirements of this section are in addition to those prescribed by chapter 9-12, "Subdivision," B.R.C. 1981. Ordinance Nos. 5747 (1995); 5986 (1998); 6093 (1999) Footnotes: --- (10) --- See also section 8-2-23, "Alley Paving Required Prior to Issuance of Building Permit," B.R.C. 1981.
Ask a question about Boulder law
Corpus searches the Boulder sections it holds and shows the ones that match, with their citations. Free, no sign-in.
